Quick Guide - 4480XD Bale Carrier
10
Buhler Trading Inc. 1260 Clarence Ave. Winnipeg, MB. R3T 1T2
Tel.: (204) 661 - 8711 | Fax: (888) 524 - 1003 | www.farm-king.com
B. START BALE LOADING
Note:
Ensure all functions are in the HOME
position before loading.
Hold the START button (Item 1) and the loading
sequence will begin by clamping the bale
Continue to hold the START button until the
START button blinks GREEN and the bale has
been clamped.
Release the START button.
WARNING
AVOID LIFT ARM DAMAGE
When operating along tree-lines, always
monitor the lift arm operation.
Verify that the lift arm and bale will not make
contact with branches or overhead obstructions
as the bale is raised and placed on the carrier
deck.
Figure 18
Figure 19
1
1
1
1
C. STOP LOADING
Select PAUSE (Item 1) to stop the loading
sequence at any time
.
The loading sequence will stop and the PAUSE
icon will blink AMBER in color. The START icon
will be WHITE in color.
Note:
When the sequence is paused, only the
bale lift raise / lower can be operated.
Select PAUSE a second time to cancel the
loading sequence.
Select START while the loading sequence is
paused to start the sequence where it left off.
The START icon will be GREEN in color. Allow
bale carrier to run through the complete cycle.
Select and hold HOME to return all functions to
the HOME position. The loading sequence will
not be able to continue until all functions are
back in the Home position.