1.
Install light bulbs into sockets by threading in a
clockwise direction. (Figure 1)
Bulb
How to Install Your Light Bulbs
8
How to Assemble Your Ceiling Fan (continued)
7.
Cut off excess lead wire approximately 6 to 9 inches
above top of the top of the downrod. Strip insulation off
1/2 inch from the end of each lead wire. (Figure 7)
NOTE:
All set screws must be checked, and retightened
where necessary, before installation.
Figure 6
Figure 7
6.
Reinstall the hanger ball on the downrod as follows.
Route the black, white and blue wires through the
hanger ball. Position the pin through the two holes in
the downrod and align the hanger ball so the pin is
captured in the groove in the top of the hanger ball.
Pull the hanger ball up tight against the pin. Securely
tighten the set screw in the hanger ball. A loose set
screw could create fan wobble. (Figure 6)
Motor Assembly
Figure 1
Summary of Contents for VINTERE LP8350LAZ
Page 17: ......
Page 34: ...6 7 34 Figura 1 1 2 3 4 5 8 9 Vintere 10 Modelo N º LP8350LAZ Ilustración del despiece NOTA ...
Page 35: ......