background image

- 8 -

E230427

»

Please read the instructions carefully before installation.

»

The device should be installed and operated by qualified per-

sonnel who are familiar with its design, operation, and asso-

ciated risks.

»

Do not install a meter that is damaged or incomplete.

»

The user is responsible for proper grounding of the system, 

proper selection, installation, and efficiency of other devices 

connected to the meter, including safety devices such as over-

current, residual current and overvoltage circuit breakers.

»

Before connecting the power supply, make sure that all cables 

are connected correctly.

»

It is essential to observe the operating conditions of the meter 

(supply voltage, humidity, temperature).

»

To avoid electric shock or damage to the meter, turn off the 

power supply whenever the connection is changed.

»

Do not make any changes to the unit yourself. Doing so can 

result in damage to or improper operation of the device, 

which in turn can pose a threat to people operating it. In such 

cases, the manufacturer is not responsible for the resulting 

events and may refuse the provided warranty in the event of 

a complaint.

General work safety conditions

Summary of Contents for LE-05d

Page 1: ...to energy taken in the entire three phase system and its value is determined by the segment LCD display Numbers after the decimal point indicate decimals 1 kWh 100 Wh Purpose Functioning F F Filipowsk...

Page 2: ...equipped with pulse output This allows you to con nect another pulse device SO that reads pulses generated by the meter No additional connected equipment is required for proper operation of the meter...

Page 3: ...nd output terminal covers to pre vent any attempts to bypass the meter The meter is marked with individual serial number allowing its unambiguous identification The marking is laser engraved and canno...

Page 4: ...vers 4 Connect the voltages of the phases to be monitored as indica ted to the terminals 1 L1 3 L2 5 L3 5 Connect the circuit to be measured or a single consumer to the terminals 2 L1 4 L2 6 L3 6 Conn...

Page 5: ...5 1 L1IN phase 5 L3IN phase 2 L1OUT phase 6 L3OUT phase 3 L2IN phase 8 pulse output 4 L2OUT phase 9 pulse output Wiring diagram...

Page 6: ...ss II housing PC ABS material own power consumption 10 VA 2 W indication range 0 99999 9 kWh meter constant 800 imp kWh signalling current consumption A C phases 2 red LED read out signalling red LED...

Page 7: ...declares that the device is in conformity with the essential requirements of the Low Voltage Directive LVD 2014 35 EU and the Electromagnetic Compatibility EMC Directive 2014 30 UE The CE Declaration...

Page 8: ...d overvoltage circuit breakers Before connecting the power supply make sure that all cables are connected correctly It is essential to observe the operating conditions of the meter supply voltage humi...

Reviews: