Section 2: Company Service Information
03/08
10
50612 Rev. 9
Pre-Installation Checklist
The following points should be checked and discussed with the
Area Sales Manager
and/or customer
, if necessary, before the technician goes to the site and installs the
equipment.
9
Check the customer's application to make certain it is within the capabilities and
design parameters of the equipment.
9
If the installation process might disrupt normal business operations, tell the
customer and ask that they make ample arrangements.
9
Be sure that the equipment operator(s) are available for
training.
9
The service technician reviews the recommended setup with
the Area Sales Manager or Area Service Manager, and
together they identify all necessary variations to satisfy the
customer's particular application.
Unpacking
Follow these guidelines when unpacking all equipment:
9
Check in all components and accessories according to the customer's order.
9
Remove all components from their packing material, checking against the invoice
that they are accounted for and not damaged.
Advise the shipper immediately, if damage has occurred.
Order any parts necessary to replace those which have been damaged.
Keep the shipping container and packing material for future use.
Check the packing list.
9
Collect all necessary installation manuals for the equipment
and accessories.
9
Open the equipment and perform an inspection, making
certain that all hardware, electrical connections and printed
circuit assemblies are secure.
9
Do not reinstall the cover if the final installation is to be
performed after the pre-installation checkout.
Summary of Contents for 50612
Page 2: ......
Page 6: ......
Page 24: ...03 08 24 50612 Rev 9 Parts Diagram 50612 2 Corner 4 Corner 1 Corner 2 Corner 3...
Page 29: ......
Page 30: ...Floor Scale SERVICE MANUAL DOCUMENT 50612 Manufactured by Fancor Inc...