Operation Manual
‘’
38
No. Part
No.
Name
Q’ty
Spec.
note
1 R102-405-000
Rim
1
φ
20
2 R102-503-000 Back
board
1
15mm
3
R102-126-000
Bearing rack
1
3 mm
4 R102-303-000 Shield
ring
1
d
0
=16
5 R102-304-000 Bearing
axis
13
6
R102-127-000
Bearing track
1
1.5 mm
7
R102-128-000
Sensor rack
1
1.5 mm
8 R102-129-000 Reinforce_L
1
9 R102-130-000 Reinforce_R 1
10
R102-131-000
Attached board
1
1.5 mm
11 R102-132-000 Sensor
board
1
12 R102-133-000 Sensor
block
13
R102-134-000
Main frame
1
3 mm
14
R102-135-000
Guide I
2
2 mm
15 R102-136-000
Guide
Π
2
2mm
16 R102-137-000
Bracket
2
3
mm
17 R102-406-000
Bearing
11
6002
18
R102-138-000
Connected rod
1
2 mm
19 R102-139-000 Motor
rack
1
2mm
20
R102-407-000 Start up capacitor
1
21 R102-408-000
Motor
1
YN70-15Z/70JB100
G8
22 R102-140-000
Light tube
bracket
1 Q235
23
R102-141-000
Light tube cover
1
Q235
24 R102-409-000 Reflect
paper
1
50
×
55
25 R102-410-000 Ball
detected
2
E3F-R2N1
26
R102-142-000
Chain jacket
1
BLK PE
Summary of Contents for Half Court Hoops
Page 1: ......
Page 9: ...Operation Manual 8 Open the front bracket Step 2 ...
Page 12: ...Operation Manual 11 Install ball gate assembly Install playfield Step 5 ...
Page 13: ...Operation Manual 12 Install header assembly Step 6 ...
Page 14: ...Operation Manual 13 Step 7 Install front panel Fix control panel Step 7 ...
Page 15: ...Operation Manual 14 Fix side bracket Step 8 ...
Page 34: ...Operation Manual 33 11 Overall structure 11 1 Main part 1 ...
Page 36: ...Operation Manual 35 11 2 Main part 2 ...
Page 38: ...Operation Manual 37 11 3 Motion Assy ...
Page 40: ...Operation Manual 39 11 4 Ball gate Assy ...
Page 43: ...Operation Manual 42 11 6 Other electroinc component ...
Page 45: ...Operation Manual 44 11 7 Game decal 8 10 5 6 7 12 20 21 22 23 11 24 16 18 9 1 3 4 2 ...