Operation Manual
‘’
15
3.3 Layout on control panel
:
Control panel
:
Step 1
:
Connecting
.
Step 2
:
Connecting
Low voltage exit
Link wire “Link2” exit
High voltage exit
Link wire “Link 1” exit
Power cord exit
Low voltage wires
go through this
hole.
High voltage wires go
through this hole.
link1
link2
Power cord exit.
Connect the wires to the
PBC as per the numbers
marked on the PBC.
Summary of Contents for Half Court Hoops
Page 1: ......
Page 9: ...Operation Manual 8 Open the front bracket Step 2 ...
Page 12: ...Operation Manual 11 Install ball gate assembly Install playfield Step 5 ...
Page 13: ...Operation Manual 12 Install header assembly Step 6 ...
Page 14: ...Operation Manual 13 Step 7 Install front panel Fix control panel Step 7 ...
Page 15: ...Operation Manual 14 Fix side bracket Step 8 ...
Page 34: ...Operation Manual 33 11 Overall structure 11 1 Main part 1 ...
Page 36: ...Operation Manual 35 11 2 Main part 2 ...
Page 38: ...Operation Manual 37 11 3 Motion Assy ...
Page 40: ...Operation Manual 39 11 4 Ball gate Assy ...
Page 43: ...Operation Manual 42 11 6 Other electroinc component ...
Page 45: ...Operation Manual 44 11 7 Game decal 8 10 5 6 7 12 20 21 22 23 11 24 16 18 9 1 3 4 2 ...