UPS Start-up Procedure
SSG1.5KRM Models
UPS shown for illustration purposes only, rear panel layout and operating voltage may vary.
1. Remove the 30A / 250V fuse from the plastic bag attached to the fan grill on the UPS rear
panel.
2. Locate the battery pre-charge button on the UPS rear panel. Press and hold the button for 3
seconds.
3. Install the battery fuse into the housing. Push and turn clockwise to secure.
4. Connect the supplied AC power cord to the AC power cord inlet.
5. Connect the AC power cord plug to a properly rated wall receptacle.
6. Turn on the AC power switch located on the UPS front panel.
7. Allow 30 to 45 seconds for the UPS to complete the power on self-test.
8. Confirm the UPS display icons for online mode operation. See below.
9. Connect the load to the output receptacles then power on the load.
AC Power Cord Inlet
Battery Fuse
Battery Pre-charge Button