![Falcon SSG1.5KRM-1 Installation & User Manual Download Page 21](http://html1.mh-extra.com/html/falcon/ssg1-5krm-1/ssg1-5krm-1_installation-and-user-manual_3439855021.webp)
21
Getting Started
Installation Environment
The UPS can be installed as a standalone tower or rack mounted in a typical 19” equipment rack. Each
UPS inverter and battery bank requires 2U (3.5” / 88.9mm) of vertical rack space. For equipment rack
mounting, please refer to page 22 of this user’s manual.
Do not block air flow.
Allow a minimum of 3 inches / 76.2mm clearance from the front and rear panel air vents.
Environment:
o
Intended for use in a protected environment, free from moisture, flammable gases or
fumes and corrosive substances.
o
Ambient
Temperature:
Ideal: 25ºC to 30ºC (77ºF to 86ºF)
Maximum: -20ºC to 55ºC (-4ºF to 131ºF)
o
Humidity:
10-95%
(Non-condensing)
Airflow Direction
DO NOT BLOCK
DO NOT BLOCK