background image

15

CIRCUIT DIAGRAM for E3840F

N E

24

6

12

10

8

42

TO

 ELEMENT

BO

X

16

OPER

ATING

POWER SWIT

CH

31

22

15

79

11

SAFE

TY

CONT

AC

TO

R

30

TIL

T SWIT

CH

SAFE

TY

 ST

AT

29

28

22

13

5

L1

L2

L3

7

A2

A1

17

ON/OFF SWIT

CH

5A FUSE

21

2A FUSE

23

FAST

CO

NTROLLER

98

82

99

POWER NEON

24

95

C5

83

HEA

T NEON

97

96

C6

19

81

C9

31

25

110

111

THERMIST

OR PROBE

M

BROWN

P5

P7

41

P9

35

37

P1

P3

TO

 CO

NT

RO

L

PA

NE

L

43

BL

UE

GR/Y

L

1K5

BALLAST RESIST

OR

C7

C8

90

94

84

46

38

2 W

AY

TERMINAL BL

OCK

112

TIMER

A2

A1

15

18

16

44

36

34

PUMP SWIT

CH

45

13

14

24

28

29

21

Summary of Contents for E3840

Page 1: ...tion and cleaning of the appliance IT IS MOST IMPORTANT THAT THESE INSTRUCTIONS BE CONSULTED BEFORE INSTALLING AND COMMISSIONING THIS APPLIANCE FAILURE TO COMPLY WITH THE SPECIFIED PROCEDURES MAY RESU...

Page 2: ...n systems Gas water and electrical supply external to unit Light bulbs Re installing vacuum in kettle jackets Replacement of grill burner ceramics when damage has been clearly caused by misuse Where a...

Page 3: ...e installed on a firm level floor in a well lit draught free position The fryer should be installed in a freestanding position to prevent any possibility of sideways tipping under force The means of r...

Page 4: ...must be connected in accordance with the various regulations listed on the cover of this manual 2 1 ASSEMBLY a Unpack appliance b Unpack fryer baskets and accessories c Place element guard and baskets...

Page 5: ...l before any manual handling Note The oil container may be heavy Drain small amounts at a time if necessary before lifting container Manual handling regulations should be observed 5 SECTION 3 SERVICIN...

Page 6: ...g and start capacitor connections c Remove nuts from pump mounting bolts accessed through fryer door at rear of oil bucket compartment and lift pump clear d Disconnect pump from bracket Replace in rev...

Page 7: ...SECTION 5 CRITICAL DIMENSIONS 7 8 10 Wu Set to 0 8 Set to 10 minutes Set to Wu Timer Pump Settings Set for 230V...

Page 8: ...ore operation pan requires to be thoroughly cleaned and dried Discolouration of heated parts is caused by factory testing to ensure unit is satisfactory It will not affect quality or performance An el...

Page 9: ...radle and back into fryer to engage with pump Please Note Warning Do not handle filter components or adjacent surfaces when pump is operating Components will remain hot for a period after filtering Al...

Page 10: ...It should be noted that certain scouring pads including nylon types could easily mark stainless steel Care should be exercised during cleaning process When rubbing stainless steel with a cloth always...

Page 11: ...g bitter to taste 6 During quiet spells it is recommended that thermostat is turned down to a lower setting This will conserve energy in addition to extending expected oil life 7 To ensure a good eati...

Page 12: ...E LIST SEE DRAWING BW49459 FOR WIRE LIST ELEMENT BOX ELEMENT BOX CHASSIS LEG CHASSIS LEG 22 22 BALLAST BALLAST RESISTOR RESISTOR 14 14 2A A S FUSE 2A A S FUSE 23 23 24 24 28 28 SAFETY SAFETY CONTACTOR...

Page 13: ...A A S FUSE 2A A S FUSE 23 23 24 24 28 28 1 PUMP SWITCH PUMP SWITCH A 2 3 6 5 4 A A B B B 36 36 25 25 8 10 10 12 12 13 13 1 2 3 6 5 4 9 8 7 9 WAY MALE PLUG HOUSING 9 WAY MALE PLUG HOUSING MATE WITH PUM...

Page 14: ...CH SAFETY STAT 29 28 1 3 5 L1 L2 L3 7 A2 A1 17 ON OFF SWITCH 2A FUSE 23 FAST CONTROLLER 98 82 99 POWER NEON 24 95 C5 83 HEAT NEON 97 C6 19 81 C9 110 111 112 THERMISTOR PROBE 2 WAY TERMINAL BLOCK TO CO...

Page 15: ...1 3 5 L1 L2 L3 7 A2 A1 17 ON OFF SWITCH 5A FUSE 21 2A FUSE 23 FAST CONTROLLER 98 82 99 POWER NEON 24 95 C5 83 HEAT NEON 97 96 C6 19 81 C9 31 25 110 111 THERMISTOR PROBE M BROWN P5 P7 41 P9 35 37 P1 P3...

Page 16: ...16...

Reviews: