22
STEP 8: DRIVE BOTTOM SCREW
STEP 6: DRIVE TOP SCREW
STEP 4: CONNECT THROTTLING VALVE
STEP 7: LEVEL TANK
STEP 5: PUSH TUBE BACK INTO TANK
STEP 3: LOCATE THE CEILING HOLE
STEP 2: MEASURE THE LOCATION
STEP 1: LOCATE WALL STUD
4: Drainback Tank Installation
Optional Mounting: If a stud isn’t conveniently located, mount the drainback tank to
two (2) 1” x 4” stringers between studs.
Locate a wall stud near the desired drainback tank mounting position. Mark the location.
Hold the drainback tank in place near the mounting site. The top of the drainback tank should be between 6”–12”
from the ceiling. The bottom of the drainback tank should be a minimum of 3’ to the top of the circulation module.
Hold the drainback tank in place over the mark. Raise the drainback tank straight up until the tubing (at the top)
touches the ceiling. Mark the location where the tubing touches the ceiling. Make a second mark directly above the
sight glass tube.
Support the drainback tank so that the bottom fitting is off the floor. Pull tubing out about 6” and push on throttling valve.
Push tubing back into drainback tank until end of the tube touches the bottom of the tank.
Move the drainback tank back to the correct mounting location. Drive the top bolt into the wall stud. Do not tighten
all the way. If you miss the wall stud, repeat your measurements.
Drive the bottom bolt into the wall stud. Do not tighten all the way. If you miss the wall stud, repeat your measure-
ments. Recheck that the tank is level. Finish mounting the drainback tank by tightening the mounting bolts (top
and bottom).
Use a level to set the drainback tank straight.
Summary of Contents for Drainback 200 Series
Page 33: ...31...