
English
16 EN
1
3
2
4
5
A
FILTER-HOLDERS
FILTER-HOLDERS -
This operation must be made on all the filter-holders at the end of each working day
Remove the filters from the filter holders.
Soak the filters and the filter
holders in this solution for
about 15 minutes.
NOTE!
Only immerse the
metal parts.
Place the filters back in the filter holder, making sure that
the anchoring spring (
A
) of the filter is in its slot.
Remove any residue with a sponge and rinse well with
running cold water.
STEAM DISPENSING PIPES -
This operation must be made at the end of each working day
1.
Using a suitable container, remove an adequate amount of hot water > 194°F (90 °C) from the boiler, enough to cover
the part of the nozzle that comes into contact with the milk.
2.
Let the nozzle steep for at least 30 minutes.
3.
Throw the water away and rinse the container thoroughly.
4.
Using the nozzle, heat an adequate amount of cold water to at least > 149°F (65 °C), enough to cover the part of the
nozzle that came into contact with the hot water used in step 1.
5.
Throw the water away and rinse the container thoroughly.
6.
Turn the tube towards the cup tray and very carefully dispense steam for 10 seconds.
7.
Dry the nozzle with a clean, slightly damp sponge that does not leave behind any fibre residue.
DO NOT use abrasive products.
HOT WATER DISPENSING PIPE -
This operation must be made at the end of each working day
Using a clean sponge, wash with hot water removing any organic residue present. Rinse carefully.
DO NOT use abrasive products.
NOTE: the procedures described below can also be carried out when the machine is switched off.
DRIP PAN -
This operation must be made at the end of each working day
Remove the drip plan and complete the cleaning with running water
DISCHARGE BASIN -
This operation must be made at the end of each working day
Pour about a liter of hot water into the discharge basin to remove any discharge residues.
BODYWORK -
This operation must be made at the end of each working day
Use a soft cloth and cleaning products WITHOUT ammonia or abrasives, removing any organic residue present in the
work area.
NOTE
. Do not spray liquids into the panel slots.
Pour one litre of hot water
(122÷176°F;
50÷80°C
) and
10 g of detergent powder,
equal to two teaspoons, in
a suitable container that is
neither aluminium nor iron.
Summary of Contents for E61 Legend
Page 23: ...A B C D E ...