background image

Bench (Front View)

Seat (Front View)

Module Joining Detail

M10 x 25mm button 

head bolt & locknut

Endplate of frame

Sub-surface Fix Detail

Ground

Level

150(Ctrs)

100

12

M10 x 75mm
sleeve anchor
into Ø12mm hole
in foundation

Rectangular

fixing plate

2

00

140(Ctrs)

M10 x 200mm & S/S
cap nut threaded rod
anchor (resin fixed)
into Ø14mm hole

Gnd Lvl

Foundation -

400x400x400mm
concrete pads
(recommended)

Round fixing

plate

Foundation -

400x400x400mm
concrete pads
(recommended)

14

75

Surface Fix Detail

870

87

0

8

7

0

87

0

870

87

0

8

7

0

87

0

2

1

0

0

 (

C

tr

s

)

2100 (Ctrs)

400

4

0

0

Ø2275

785

400

Ground Level

Foundation -

400x400x400mm concrete

pads (recommended)

78

5

400

Ground Level

Foundation -

400x400x400mm concrete

pads (recommended)

10

0

Installation Instructions

ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT

Full Tree Bench / Seat 

(surface and sub-surface fix)

1.  Install suitable foundation pads (see illustration) each with top face at 
    ground level or 100mm below finished ground level for sub-surface fix.
2. Unpack bases and attach to the bench/seat using 2 no. M10 x 25mm 
    button head bolts per base and tighten to 14Nm
3. Assemble 4 no. quarter modules and fix together using 2 no. M10 x 25mm 
    button head bolts per join and tighten to 14Nm (see illustration). For fixing 
    around a tree the seat can be assembled in two halves with final assembly 
    once it’s in position
4. Position assembled bench/seat 

(a crane or forklift will be required at this 

    stage)

 in correct orientation with bases centrally on foundation pads; mark 

    hole positions through base plates
5. Remove the bench/seat; drill holes Ø14mm x 200mm deep (surface fix) or 
    Ø12mm x 75mm deep or as manufacturer’s recommendations 
    (sub-surface fix).
6. Clear debris from holes.
7a. (Surface fix) Fill the holes to within approximately 35mm from the top 
      with Hilti HY150 resin (or similar). Lift the bench/seat (with threaded   
      anchor rods/capnuts in place) and carefully lower the anchors into the 
      holes, leave for two hours to set.
7b. Using a torque wrench, tighten nuts and washers over flange plates to 
       30Nm to fasten down the bench/seat.
8. (Sub-surface fix) Reposition bench/seat unit and fix each base to 
    foundation pads using 2 no. zinc-coated M10 x 75mm sleeve anchors 
    tightened to 50Nm (or as per manufacturer’s instruction). Ensure 
    bench/seat remains level during fixing process.
9. Check level & re-instate ground level if necessary

IMPORTANT NOTE:

Ensure  that  stainless  steel  is  protected  during  site  cutting  of  stone  – 
contamination  from  disc  cutters  will  produce  corrosion  on  stainless  steel 
components.