![background image](http://html1.mh-extra.com/html/factory-furniture/tree/tree_operation-and-maintenance-manual_3177532004.webp)
Bench (Front View)
Seat (Front View)
Module Joining Detail
M10 x 25mm button
head bolt & locknut
Endplate of frame
Sub-surface Fix Detail
Ground
Level
150(Ctrs)
100
12
M10 x 75mm
sleeve anchor
into Ø12mm hole
in foundation
Rectangular
fixing plate
2
00
140(Ctrs)
M10 x 200mm & S/S
cap nut threaded rod
anchor (resin fixed)
into Ø14mm hole
Gnd Lvl
Foundation -
400x400x400mm
concrete pads
(recommended)
Round fixing
plate
Foundation -
400x400x400mm
concrete pads
(recommended)
14
75
Surface Fix Detail
870
87
0
8
7
0
87
0
870
87
0
8
7
0
87
0
2
1
0
0
(
C
tr
s
)
2100 (Ctrs)
400
4
0
0
Ø2275
785
400
Ground Level
Foundation -
400x400x400mm concrete
pads (recommended)
78
5
400
Ground Level
Foundation -
400x400x400mm concrete
pads (recommended)
10
0
Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT
Full Tree Bench / Seat
(surface and sub-surface fix)
1. Install suitable foundation pads (see illustration) each with top face at
ground level or 100mm below finished ground level for sub-surface fix.
2. Unpack bases and attach to the bench/seat using 2 no. M10 x 25mm
button head bolts per base and tighten to 14Nm
3. Assemble 4 no. quarter modules and fix together using 2 no. M10 x 25mm
button head bolts per join and tighten to 14Nm (see illustration). For fixing
around a tree the seat can be assembled in two halves with final assembly
once it’s in position
4. Position assembled bench/seat
(a crane or forklift will be required at this
stage)
in correct orientation with bases centrally on foundation pads; mark
hole positions through base plates
5. Remove the bench/seat; drill holes Ø14mm x 200mm deep (surface fix) or
Ø12mm x 75mm deep or as manufacturer’s recommendations
(sub-surface fix).
6. Clear debris from holes.
7a. (Surface fix) Fill the holes to within approximately 35mm from the top
with Hilti HY150 resin (or similar). Lift the bench/seat (with threaded
anchor rods/capnuts in place) and carefully lower the anchors into the
holes, leave for two hours to set.
7b. Using a torque wrench, tighten nuts and washers over flange plates to
30Nm to fasten down the bench/seat.
8. (Sub-surface fix) Reposition bench/seat unit and fix each base to
foundation pads using 2 no. zinc-coated M10 x 75mm sleeve anchors
tightened to 50Nm (or as per manufacturer’s instruction). Ensure
bench/seat remains level during fixing process.
9. Check level & re-instate ground level if necessary
IMPORTANT NOTE:
Ensure that stainless steel is protected during site cutting of stone –
contamination from disc cutters will produce corrosion on stainless steel
components.
4
FULL TREE
installation