background image

factoryfurniture.co.uk

Installation Instructions

All installation works to be carried out by competent 
personnel - install as complete unit. 

Murton Table & Picnic Table

1. 

Install suitable foundation pads (see illustration) 
each with top face at  ground level

2. 

Position table in correct orientation with bases 
centrally on foundation  pads, then mark hole 
positions through base plates.

3. 

Remove the table; drill holes Ø14mm x 220mm 
deep

4. 

Clear debris from holes.

5. 

Fill the holes to within approximately 35mm from the 
top with Hilti  HY150 resin (or similar). Lift the table 
(with threaded anchor  rods/capnuts in place) and 
carefully lower the anchors into the holes,  leave for 
two hours before using.

6. 

Using a torque wrench, tighten nuts and washers 
over flange plates to 30Nm to fasten down the table.

7. 

Check level

IMPORTANT NOTE

Ensure that stainless steel is protected during site 
cutting of stone – contamination from disc cutters will
produce corrosion on stainless steel components.

2020

72

0

1920 (Fixing Ctrs)

Foundation 2 no. pads

400x300x1000mm in

C20 concrete

(recommendation only)

Ground level

600 (Fixing Ctrs)

1650

825

45

0

2020

72

0

1920 (Fixing Ctrs)

Foundation 2 no. pads

400x300x1000mm in

C20 concrete

(recommendation only)

Ground level

600 (Fixing Ctrs)

825

825

Table

Picnic Table

22

0

200mm x M10 

threaded rod 

anchor resin fixed 

into Ø14mm hole

M10 S/S

cap nut 

18

400 x 300 x 1000mm

C20 Concrete Base 

(recommended)

Ground level

Reviews: