background image

Foundation 2 no. pads 

400x400x400mm in C20 concrete 

(recommendation only)

2100

1270 Ctrs

45

0

390

Foundation 2 no. pads 

400x400x400mm in C20 concrete 

(recommendation only)

2100

1270 Ctrs

45

0

390

10

0

Ground Level

M10 x 75mm 

sleeve anchor 

into 12mm hole 

in foundation

4

150

Foundation - 

400x400x400mm 

concrete block 

(recommended)

10

0

M10 x 75mm sleeve 

anchor into 12mm hole 

in foundation with 

anti-vandal armour ring

4

150

75

12

75

12

Ground Level

Installation Instructions

ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS 

COMPLETE UNIT.

Surface fix

Sub-surface fix

LOUVRE bench 

(surface & sub-surface fix)

1. Install suitable foundation pads (see illustration) each with top face at ground level or 100mm below finished ground level
for sub-surface fix
2. Position bench in correct orientation with bases centrally on foundation pads; then mark hole positions through base plates.
3. Remove the bench; drill holes Ø12mm x 75mm deep or as manufacturer’s recommendations (sub-surface fix).
4. Clear debris from holes.
5. Reposition bench unit and fix to foundation pads using 4 no. zinc-coated M10 x 75mm sleeve anchors tightened to 50Nm 
(or  as  per  manufacturer’s  instruction).  Ensure  bench  remains  level  during  fixing  process.  For  surface  fix,  hammer  an 
anti-vandal armour ring over each bolt head to prevent tampering.
6. Check level & re-instate ground level if necessary (sub-surface fix).

IMPORTANT NOTE:

Ensure that stainless steel is protected during site cutting of stone – contamination from disc cutters will produce corrosion on 
stainless steel components.

4

LOUVRE installation

Reviews: