Foundation 2 no. pads
400x400x400mm in C20 concrete
(recommendation only)
2100
1270 Ctrs
45
0
390
Foundation 2 no. pads
400x400x400mm in C20 concrete
(recommendation only)
2100
1270 Ctrs
45
0
390
10
0
Ground Level
M10 x 75mm
sleeve anchor
into 12mm hole
in foundation
4
150
Foundation -
400x400x400mm
concrete block
(recommended)
10
0
M10 x 75mm sleeve
anchor into 12mm hole
in foundation with
anti-vandal armour ring
4
150
75
12
75
12
Ground Level
Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS
COMPLETE UNIT.
Surface fix
Sub-surface fix
LOUVRE bench
(surface & sub-surface fix)
1. Install suitable foundation pads (see illustration) each with top face at ground level or 100mm below finished ground level
for sub-surface fix
2. Position bench in correct orientation with bases centrally on foundation pads; then mark hole positions through base plates.
3. Remove the bench; drill holes Ø12mm x 75mm deep or as manufacturer’s recommendations (sub-surface fix).
4. Clear debris from holes.
5. Reposition bench unit and fix to foundation pads using 4 no. zinc-coated M10 x 75mm sleeve anchors tightened to 50Nm
(or as per manufacturer’s instruction). Ensure bench remains level during fixing process. For surface fix, hammer an
anti-vandal armour ring over each bolt head to prevent tampering.
6. Check level & re-instate ground level if necessary (sub-surface fix).
IMPORTANT NOTE:
Ensure that stainless steel is protected during site cutting of stone – contamination from disc cutters will produce corrosion on
stainless steel components.
4
LOUVRE installation