
25
MOUNTING RANGE HOOD UNDER THE CABINET
20"
24"-30"-36"
12"
7"
2" 13/16
10" 1/2
1" 5/16
1" 5/16
7" 11/16
2"
7" 1/2
13/16"
13/16"
Locate the hole on the Range Hood for the power cord (See Section " CHOOSE
VERTICAL OR HORIZONTAL ELECTRICAL CONNECTION KNOCKOUT'S ") and pass
the cord through the appropriate hole.
Lift the hood to the cabinet and pass the power cord through the appropriate holes
on the Range Hood and through the cabinet to the power source.
1
2
Top View
BackView
Summary of Contents for Levante II
Page 6: ...6 RANGE HOOD DIMENSIONS 3 29 15 16 35 15 16 30 36 30 36...
Page 7: ...7 MIN 24 OVER ELECTRIC MIN 30 OVER GAS INSTALLATION HEIGHT REQUIREMENTS Min 24 30...
Page 39: ...39 DIMENSIONS DE LA HOTTE 3 29 15 16 35 15 16 30 36 30 36...
Page 72: ...72 3 29 15 16 35 15 16 30 36 30 36 DIMENSIONES DE LA CAMPANA DE COCINA...