
11
ONLY FOR CANADIAN MARKET
1
2
For ducted installations only:
5HPRYHWKH´OWHUVRQHDWDWLPHE\SXVKLQJWRZDUGVWKHEDFNRIWKHKRRGDQG
pulling down at the same time.
Install the screws as pictured.
Install Grid
D
with the two screws removed from step 2. Screw the protection
grid into the location shown in the picture below. (The correct location has a
rectangular cut out to accommodate the grid.)
7DNHFDUHWRVFUHZWKHJULGFRPSOHWHO\µXVKWRDYRLGXQZDQWHGQRLVH
Remove the screws as pictured.
Remove two of the screws from the motor assembly housing as pictured.
3
Phillips Screwdriver
D
Summary of Contents for Levante II
Page 6: ...6 RANGE HOOD DIMENSIONS 3 29 15 16 35 15 16 30 36 30 36...
Page 7: ...7 MIN 24 OVER ELECTRIC MIN 30 OVER GAS INSTALLATION HEIGHT REQUIREMENTS Min 24 30...
Page 39: ...39 DIMENSIONS DE LA HOTTE 3 29 15 16 35 15 16 30 36 30 36...
Page 72: ...72 3 29 15 16 35 15 16 30 36 30 36 DIMENSIONES DE LA CAMPANA DE COCINA...