![Faber Levante E Installation Instructions; Use And Care Information Download Page 10](http://html1.mh-extra.com/html/faber/levante-e/levante-e_installation-instructions-use-and-care-information_3682297010.webp)
10
Preparing the hood for electrical knockouts
7" 1/2
13/16"
13/16"
CHOOSE VERTICAL OR HORIZONTAL
ELECTRICAL CONNECTION KNOCKOUT'S
PREPARE FOR
ELECTRICAL – REMOVE
HOOD JUNCTION BOX
Remove the hood
junction box from inside
the hood. Set the cover
and its mounting screws
aside.
1
+RRG
-XQFWLRQ
%R[
Hood
Junction
Box
Summary of Contents for Levante E
Page 6: ...6 RANGE HOOD DIMENSIONS 7 1 4 3 23 15 16 29 15 16 35 15 16...
Page 7: ...7 MIN 24 OVER ELECTRIC MIN 30 OVER GAS Min 24 Min 30 INSTALLATION HEIGHT REQUIREMENTS...
Page 31: ...31 WIRING DIAGRAM E D 9 7 02725 5 1 2 7 5 E 5 2 D 1 7 22 17 51 21752 03 7 1 1 9DF...
Page 38: ...38 DIMENSIONS DE LA HOTTE 7 1 4 3 23 15 16 29 15 16 35 15 16...
Page 63: ...63 SCH MA DE C BLAGE E D 9 7 02725 5 1 2 7 5 E 5 2 D 1 7 22 17 51 21752 03 7 1 1 9DF...
Page 70: ...70 DIMENSIONES DE LA CAMPANA EXTRACTORA 7 1 4 3 23 15 16 29 15 16 35 15 16...
Page 95: ...95 DIAGRAMA DE CABLEADO E D 9 7 02725 5 1 2 7 5 E 5 2 D 1 7 22 17 51 21752 03 7 1 1 9DF...
Page 97: ......
Page 98: ......
Page 99: ......