UK/IRL
26
<
<
<
<
3)
Assemble the flue system onto the firebox (see chapter 5).
4)
Check if applicable that the safety hatch seals the combustion
chamber properly. Do not fasten it at all! If you fasten it, this
explosion safety hatch won’t function properly!
5)
If necessary, place the DC convection system (also consult the
instruction belonging to the DC construction set).
6)
If necessary, isolate the firebox with a ceramic blanket (25 mm).
Preferred choice for insulation is unbound insulation wool (at 1000 °C
gives no smell).
Fig.16: Safety hatch
Fig.17
Summary of Contents for BF80S
Page 2: ...UK IRL 2 ...
Page 45: ...UK IRL 45 User guide ...
Page 46: ...UK IRL 46 ...
Page 55: ...UK IRL 55 ...