STEP 1: Unpacking the TAS250
STEP 2: Applying Sealant on the Back of the TAS250
STEP 3: Mounting
STEP 4: Connecting the Door Locking Device (DC Powered)
STEP 5: Connecting the Door Lock Device with an External Power Supply
STEP 6: Hooking Up Inputs
STEP 7: Connecting an External Controller
STEP 8: Connecting a 3rd Party Controller
STEP 9: Connecting the Telephone Line
STEP 10: Connecting the Telephone Line with the Ferrite (TAS250-125AUS Model for
Australia and New Zealand only)
STEP 11: Connecting the RS-485 (optional)
STEP 12: Connecting Multiple TAS250 on the Same Telephone Line (optional)
STEP 13: Connect the TAS250 to Earth Ground
STEP 14: Connect AC Power (North America only)
STEP 15: Connect DC Power (EMEA only)
STEP 16: Connecting the Backup Battery
STEP 17: Connecting the Heater Kit for Outdoor Operation (Optional)
STEP 18: Connecting the Ethernet Cable (Optional)
STEP 19: Powering Up the TAS250
STEP 20: Programming the TAS250
Appendix A - Installation Checklist
The following checklist enumerates the steps to install the system.
Installation Steps
Pages
see page 17
see page 17
see page 18
see page 19
see page 19
see page 19
see page 20
see page 21
see page 21
see page 21
see page 21
see page 22
see page 22
see page 22
see page 23
see page 23
see page 23
see page 24
see page 24
see page 24
29