3
As soon as the batteries are connected the solar control-
ler will start a self checking procedure, the battery status
LED will blink in sequence and stop at the corresponding
charge level
Plug the solar panel to the cables that go to the terminal
block:
Connect the supplied cable with MC4 connectors to the
solar panel terminal block, make sure to follow the draw-
ing below for the proper polarity
Connect Earth Ground to the negative pole of the solar
panel
Connect the battery to the corresponding terminal block.
with the suppled cable. Make sure to folow the polarity
SOLAR PANEL
+
-
+ -
BATTERY
+
+
-
-
12V
12V
If the solar panel has enough exposure to light the green
Status LED will be ON
Turn the Control Board power ON using the circuit
breaker. If the battery voltage is below 26V the board will
turn on right away, if the battery voltage is above 26V the
board will go through a batch of internal testing before
turning on. The tests will last about 40 sec.
NOTE:
The Charger / Controller is supplied by default for use
with sealed batteries. If flooded batteries are used remove
jumper (3)
4.
WIRING
Solar Kit
Fig. 3
Fig. 4