Caution: Due to the weight of this platform, two people are required to install it. Failing to use two
people can result in severe personal injury or equipment damage and may violate safety regulations.
Note: Before you install this platform, review the environmental guidelines to make sure that you are
installing and using the platform in the appropriate environment.
After the chassis is installed into a rack, you can install the cable management system and supply power to
the chassis. Optionally, you can remove the red handles from the top of the chassis.
Figure 6: An example of a platform installed using the four-point rack mounting kit
Installing the cable management system
You install the cable management system after installing the chassis into a rack.
1. Locate the cable routing brackets included with the chassis.
These brackets are in an accessory box that is included with the chassis.
2. Attach the cable routing brackets to the appropriate location on the chassis (front, middle, or rear) by
tightening the captive screws clockwise until they are completely secured to the chassis.
28
Platform Installation
Summary of Contents for VIPRION 2400
Page 1: ...Platform Guide VIPRION 2400 MAN 0344 01...
Page 2: ......
Page 6: ...6 Table of Contents...
Page 38: ...38 Platform Installation...
Page 44: ...44 Platform Maintenance...
Page 48: ...48 Environmental Guidelines...
Page 59: ...Appendix D China RoHS Requirements Topics Hazardous Substance Levels for China...
Page 61: ...61 Platform Guide VIPRION 2400...
Page 62: ...62 China RoHS Requirements...
Page 72: ...72 Index...