
.
.
.
.
.
.
s
.
.
.
.
Follow the diagrams
Connect the folding section and base parts together
Part 1203 to parts1204L and 1204R
Make sure the big slot
is facing up See diagrams
while in the open position
1205L & 1205R
Make sure the big slot is facing towards the back.
The folding section bolts should be on the inside and in front
The nut should be on the outside Do not over tighten the nuts
The pull pins should be in the back of the folding section
on the bottom base tube that connects to
the folding section
.
Insert the pull pins into the folding section
Assemble the bottom base of the goal first, then the front uprights.
Put front upright parts
in the proper locations
Front Net Lacing
OTE Lace every 3rd net box on the straight sections
eve y other
See pictures below and box front
Bottom Net Lacing
Note Lace every 3rd box on the straight sections
every other
away from the
folding section
See pictures and box fron
Temporarily secure the 5 corners of the net to the frame.
Make sure the 2 center thick ropes that go from the top 2 corners of
the goal to the back bottom are on the on the inside of the goal net before lacing.
Starting at the folding section and lace up Securely tie off the rope
Lace the bottom front corner box
N
Lace
box on the corners
Tie of with good knots.
Lace
box on the corners
Leave about 8 of rope to tie off the pull pin
Lace the rope around the tube and make a secure knot
so you do not cut the rope when folding the goal
Tie off with a good knots
t
Put a little Super Glue on all knots
if possible, to keep the knots from
coming untied
.
.
.
:
r
.
.
:
.
"
.
.
The welded nut on
the movable ring
faces back.
It is used for the
Accessory Backstop Kit.
Note
Use a rubber mallet or block of wood
:
.
Precision Connections will fit snugly.
if needed
Take the pull pin out & fold goal
Insert pin here for storage
Practice Play Fold-It-Away
TM
Page 2
03-85572 rev. 2017-08-15
6