36
ExtremeSwitching SLX 9140 Hardware Installation Guide
9036857-00 Rev AA
Installing the Universal Four-Post Rack Kit (XBR-R000296)
FIGURE 27
Attaching the rear brackets to the front rack posts
1
Screws, 10-32 x 5/8-in., panhead Phillips
2
Retainer nuts, 10-32