first switch login 36
frequency
, see
radio frequency interference (RFI)
G
grounding
racks 15
requirements 25
wiring closet 13
H
hazardous substances 53
humidity 14
I
Industry Canada Notice 50
industry standards 25
initial switch login 36
installing
fiber optic cable 18
in two-post rack 28
optical transceivers 34
optional components 34
personnel 27
power supply unit (PSU) 26
preparation 11
preparing 27
switches 26–28
tools 27
using mounting brackets) 28
J
jackets
RJ45 connector 22
L
12V DC power supply 39
XA1400 38, 39
license options 9
local management connection 36
logging in to the switch 36
M
management port
connecting to switch 36
settings 36
mounting brackets
attaching to two-post rack 28
mounting kit
two-post rack 28
N
network interface connections 35
O
Open Source Declaration 5
operating environment requirements 13
optical cables
installing 34
optical transceivers
installing 34
optional components
installing 34
P
planning
site 11
plenum-rated cable 17
pluggable transceivers
, see
optical transceivers
ports
console port settings 36
management 36
power cords
selecting 23, 49
power requirements
power supply 23
power specifications
power supply unit (PSU)
12V DC 10
alert 10
installing 26
power requirements 23
safety 26
R
rack
attaching switch 28
rack specifications
grounding 15
securing to floor 16
space requirements 15
radio frequency interference (RFI)
patch panel installation 17
preventing 23
regulatory information 45
restricted 13
restricted access 13
RFI
, see
radio frequency interference (RFI)
S
safety
requirements 45
when installing PSUs 26
Index
ExtremeAccess Series: Hardware Installation Guide
55