3
1. With all the steel pins correctly mapped out start hammering
them into the ground using a sledge hammer.
3. Attach the four foot plates currently in place to the steel pins
in the ground.
5. Attach the pole section with the turn lever next followed by the
remaining poles.
2. Lay the roof fabric on the ground behind the steel pins with the
closest four foot plates lining up to the steel pins .
4. Attach the top section of the centre pole (shortest plain pole)
to the roof fabric caps.
SET-UP INSTRUCTIONS
For safety reasons it is recommended that four people are requiard for set-up and pack down.