background image

4

3

6

5

4

Drill pilot holes at marked locations (x4).

使用電鑽在標記位置鑽4個孔

Use Wall Bracket as template to mark drilling 
locations with pencil (x4).
Use level to insure proper alignment.

使用牆板標記鑽孔位置,並利用水平儀確保水平

(右側螺絲須固定在單立木柱上)

Align Wall Bracket to marked Flat Screen 
center point.

將牆板件的中心位置對正於螢幕中心線

Screen center

Remove cover from Wall Bracket.

拆下牆板保護蓋

2”( 50 mm)

0.12”( 3 mm)

Pilot Hole Size

Pilot Hole Depth

0.6”( 15 mm)

0.12”( 3 mm)

Pilot Hole Size

Pilot Hole Depth

Drill

Drywall

Wood Stud

Summary of Contents for VCMB42

Page 1: ...TW VCMB42 Full Motion Mount With Tilt TM C...

Page 2: ......

Page 3: ...teaux en bois ou en brique du mur Poteaux en bois doivent tre d un minimum de 2x4 pouces Pour une installation s re au mur vous montez doit prendre en charge quatre fois le poids de la charge totale s...

Page 4: ...r Drill Phillips Screwdriver Socket Wrench Hammer Pencil Stud Finder A B X1 X1 K L M N O P I N O P H I J 8 8 8 Washers 5 6 4 G H J Wall Bracket Flat Screen Bracket Extenders C X4 Concrete Brick Wall A...

Page 5: ...possible injury or damage Ready Set Mount U S Brown Bear Before You Begin Tips Select your desired viewing location Use level to ensure proper alignment Identify your mounting surface Wood Stud or Co...

Page 6: ...ing locations with pencil x4 Use level to insure proper alignment Align Wall Bracket to marked Flat Screen center point Screen center Remove cover from Wall Bracket 2 50 mm 0 12 3 mm Pilot Hole Size P...

Page 7: ...6 1 5cm Wall Bracket installation complete 9 Skip to page 8 for flat panel attachment steps See below for concrete wall and brick wall installation 10 Place Wall Bracket on W A Lag Bolts and tighten x...

Page 8: ...dth and length of your Flat Screen Mark top and side center of screen dimensions with tape or pencil x4 Determine screen center point and mark with pencil Recommended height is 5 to 7 feet from the fl...

Page 9: ...r Wall Anchors into pilot holes x4 7 X Drill 2 4 60 mm 0 39 10 mm Pilot Hole Size Pilot Hole Depth Secure W A Lag Bolt and W C Washer into pilot holes x4 Leave 0 6 1 5 cm visible 0 6 1 5cm 7 O X 0 6 1...

Page 10: ...Place cover back on Wall Bracket 9 Wall Bracket installation complete 10 Flat Screen Bracket Attachment Steps 8 Not Included...

Page 11: ...to match 400 300 200 200 100 nit mm 400 X 400 300 X 300 400 X 300 200 X 100 200 X 200 300 X 200 Screen down 400 X 200 Screen up 400 300 200 Use Only Flat Screen Bracket for VESAhole patterns 200x200mm...

Page 12: ...ket with VESA hole pattern and secure with appropriate screw size and washers from Monitor Kit 2 Screws and Washers from Monitor Kit Screws from Monitor Kit With Spacers No Spacers Options Be sure to...

Page 13: ...cket To secure bracket into place tighten nuts on mounting plate with open end wrench M P x2 M P 1 Remove Wall Bracket Arm Covers and place cables into the Cable Management System Once cables are in p...

Page 14: ...12 To adjust Tilt or Alignment of Flat Screen use open end wrench M P 5 a b c Loosen nuts on mounting plate x2 Tighten nuts to secure into place x2 Adjust tilt or angle of Flat Screen...

Page 15: ...unts For warranty claims made during the Warranty Period U S Brown Bear will replace any defective product part free of charge Should a part on your U S Brown Bear product fail call U S Brown Bear at...

Page 16: ...Come hang with us THANK YOU FOR PURCHASING U S BROWN BEAR PRODUCTS GRACIAS POR ADQUIRIR UN PRODUCTO U S BROWN BEAR North Carolina S o Paulo Brazil...

Reviews: