background image

Foundation Profile

Vertical Window Profile

Vertical Door Profile

Roof Glass Holder

Top Door Guide

Gutter Profile

Bottom Window Profile

Corner Profile

Rubber Glazing Gasket

Ridge Profile

Top Window Profile

Verical Glazing Profile

Horizonal Door Profile

Gable Roof Profile

Horizontal Gable Profile

Door Frame Support Post

Connection L- Bracket

Bottom Door Guide

PRO39796

PRO 210

Foundation Anchor

Summary of Contents for Junior Victorian

Page 1: ...ASSEMBLY INSTRUCTIONS JUNIOR VICTORIAN Version 2016_1 ...

Page 2: ...r to avoid injuries We recommend consulting your local building code to determine the requirements in your area PLEASE NOTE ALL MEASUREMENTS ARE IN MILLIMETERS WE RECOMMEND WORKING WITH A METRIC TAPE MEASURE We understand that you may be more familiar and comfortable with measurements in inches and feet However this greenhouse has been manufactured in Belgium using metric measurements Keeping the ...

Page 3: ...LE 4 821 mm 4 821 mm PRO 7610 7610 77 BOTTOM WINDOW PROFILE 2 765 mm 2 765 mm PRO 7615 7615 77 TOP WINDOW PROFILE 2 765 mm 2 765 mm PRO 7619 7619 71 GLAZING PROFILE FOR UNDER ROOF WINDOW 2 708 mm 2 708 mm OPDRUK MANUAL WINDOW OPENER 2 2 PLAT 60x20x5 CONNECTION BRACKET 4 60 mm 4 60 mm PHILLIPS 4 8x19 PHILLIPS HEAD SCREW 4 8x19 8 8 SABOUT M6x12 M6X12 BOLTS AND NUTS 4 4 PRO 7619 7619 63L GLAZING BAR ...

Page 4: ...e Gutter Profile Bottom Window Profile Corner Profile Rubber Glazing Gasket Ridge Profile Top Window Profile Verical Glazing Profile Horizonal Door Profile Gable Roof Profile Horizontal Gable Profile Door Frame Support Post Connection L Bracket Bottom Door Guide PRO39796 PRO 210 Foundation Anchor ...

Page 5: ...8 1 8 JVIC 23 JVIC 24 2340 mm 92 1 8 7 8 1 8 3080 mm 121 1 4 10 1 1 4 3810 mm 150 12 6 Note Do not set concrete in the corners until the entire greenhouse frame is complete You may need some play to install the uprights ...

Page 6: ......

Page 7: ...JVIC 23 7 8 x 10 2 JVIC 24 7 8 x 12 6 ...

Page 8: ...uggestion If the unit is to be installed on a concrete foundation you will need to cut PRO210 flush with the bottom of PRO6120 You can lay the cut off PRO210 pieces on their side and use them to secure the PRO6120 to the concrete foundation Note Before assembling the foundation insert 3 M6x15 bolts as shown for the sliding door guide See page J14 1 ...

Page 9: ...Insert a bolt in corner of front and back wall for Seed Tray optional accessory See page ZB2 ...

Page 10: ......

Page 11: ... into the gutter profile before this assembly step This is shown below 1 Twist lock per end Trim the square plate on the round hook which screws down to be able to insert it in the channel Insert 28 slider loops in each gutter profile if you have ordered a shadecloth ...

Page 12: ...Suggestion Now is a good time to install the L1 corner wind braces shown on page J9 ...

Page 13: ...Insert a bolt in each upright where the seed tray shelf support will be located Refer to page ZB2 ...

Page 14: ...u have a shadecloth insert 28 hook sliders into the ridge profile at this time See page JSD 1 Twist Lock Hook Trim the square plate on the round hook which screws down to be able to insert it in the channel ...

Page 15: ...Note Roof windows can be installed in any bay Note When installing the roof profiles make note of which bays will have roof windows and insert a bolt for the connection plate ...

Page 16: ...Note Wait until assembly is complete before attaching the roof braces Use a level to ensure greenhouse is square ...

Page 17: ...astic downspout Shown below Note The gutter down pipe is attached to the base of the greenhouse with a screw that goes through the back of the elbow First drill a small hole in the back of the elbow and then a small hole in the frame of the greenhouse for the screw to thread into Run the screw through the hole on the inside of the elbow and into the greenhouse base ...

Page 18: ......

Page 19: ...1 inch long bolt Note A 1 inch long bolt is inserted into the lower profile This bolt is for the optional manual opener or the spindle opener Note Rubber seal is only installed on the sides of the roof window Glass ...

Page 20: ... part on the top of the roof window will slide into a groove in the roof beam shown below Note Inserting a bolt on either side of the roof window will prevent it from moving side to side Manual Opener is shown above This can be used in the winter when you want to secure the windows in the closed position ...

Page 21: ...to the roof crossbar for the lower mount The upper mount will clamp onto the lower roof window framing profile As shown in the diagram below The automatic opener comes with its own instructions and care guide These are located in the box with the opener Insert 2 bolts for lower mount ...

Page 22: ...SLIDING DOOR GUIDES ...

Page 23: ......

Page 24: ...SLIDING DOOR ...

Page 25: ......

Page 26: ...Insert 28 slider loops per curtain plus 1 twist lock loop at the end ...

Page 27: ...tray Note Make sure to slide 1 bolt into the bottom of the front and back seed tray profiles 2 for a Vi34 2 Slide the shelving inserts in from the open end You will need aproximately 11 3 4 for a Vi23 18 1 2 for a Vi34 Note The last shelving insert will need to be trimmed to fit 3 Install the 4th side ...

Page 28: ...or you 5 Attach the seed tray to the uprights with self tapping screws If you do not have self tapping screws drill a small pilot hole and use regular screws Note If you have forgotten to insert the bolts you can use screws Make sure to use a screw with a shaft size of at least 1 8th inch in diameter Seed Tray Optional Accessory ...

Page 29: ...88 B 2500 Lier Belgium T 32 15 30 67 80 W www janssens alusystems be E info janssens alusystems be Customer Service or Assembly Questions Give us a call Toll free 1 877 760 8500 customerservice exaco com Exaco Trading www EXACO com ...

Reviews: