background image

                                                                       
 1 

                                                        

                                                      

TM  

 

 
 

 
 
 

Installation & Operating 

 

Instructions

 

 

Note: Please read this manual thoroughly before installation and 

operation 

 

Manufactured by 

Evolution Aqua Ltd.

 

Evolution House 

Kellet Close 

Wigan WN5 0LP 

Tel: +44 (0) 1942 216554 

Fax: +44 (0) 1942 216562 

Web: www.evolutionaqua.com 

E-mail: [email protected] 

  Patent Pending 
Made in England 

Page 1

Aqua-Mania - www.aqua-mania.org - [email protected] - +34 609934211

Summary of Contents for eazypod

Page 1: ...tion and operation Manufactured by Evolution Aqua Ltd Evolution House Kellet Close Wigan WN5 0LP Tel 44 0 1942 216554 Fax 44 0 1942 216562 Web www evolutionaqua com E mail info evolutionaqua com Paten...

Page 2: ...er holds 30 litres of static K1 media As the water enters the central chamber the fine smaller solids become entrapped in the K1 After passing through the K1 media the clean water then rises and overf...

Page 3: ...ere is used as the only filtration system a total pond volume turn over of every 2 hours is found to be best Therefore if you have a 10 000 litre koi pond a flow rate of 5 000 litres per hour is ideal...

Page 4: ...t an inch from the airline supplied on the Pod Insert this into the hosepipe that connects to the air pump This will help maintain the hosepipe s rigidity when inserting it into the rubber connector a...

Page 5: ...han the outlet pipe E Turn the assembly around 180 degrees and replace the shorter length as the return pipe and the longer length as the exit pipe You have now swapped E for D over for each other Fig...

Page 6: ...her than the 30 litres supplied Cleaning and maintaining the Pod will depend on flow rate feed stocking blanket weed etc A Pod on a summer pond with heavy blanket weed will need more frequent maintena...

Page 7: ...close valve F 7 Open your inlet slide valve G and turn on your circulation pump to refill the Pod 8 When the water level in chamber B is just level with the overflow assembly close the slide valve G o...

Page 8: ...When drained close valve F and open your inlet valve to refill the Pod 9 Allow the K1 to agitate again for a minimum of two minutes 10 Open valve F to drain again If the water in the Pod is still not...

Page 9: ...erful enough or there isn t enough water in the Pod check that you used the cleaning pipe to maintain the level on a pump fed system Check all air fittings and line for leaks Make sure you haven t ina...

Page 10: ...installation or misuse Liability is limited to replacement of the defective parts This guarantee is not transferable It does not affect your statuary rights If there is a warranty issue please contact...

Reviews: