![Evo affinity 25E Owners & Installation Manual Download Page 17](http://html1.mh-extra.com/html/evo/affinity-25e/affinity-25e_owners-and-installation-manual_2446276017.webp)
INSTALLATION INSTRUCTIONS
A f f i n i t y 2 5 E
Evo, Inc. | 8140 SW Nimbus Ave., Bldg 5 | Beaverton, Oregon 97008 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | [email protected]
17
INSTALLING COOK SURFACE
Remove protective cardboard
from cook surface and drip pan
STEP 9:
Open spillover tray doors and tighten nut on end of j-hook located at inside rear of
each door.
Complete electrical installation by connecting 3-wire service line located underneath unit. Use
electrical schematic diagram at the back of this guide for reference.
Open spillover tray doors to locate end of
j-hook and secure with 1/4” x 20 nut.
Tighten 1/4” x 20 nut at end of each j-hook
to secure cooking surface to chassis.