![Evo affinity 25E Owners & Installation Manual Download Page 12](http://html1.mh-extra.com/html/evo/affinity-25e/affinity-25e_owners-and-installation-manual_2446276012.webp)
INSTALLATION INSTRUCTIONS
A f f i n i t y 2 5 E
Evo, Inc. | 8140 SW Nimbus Ave., Bldg 5 | Beaverton, Oregon 97008 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | [email protected]
12
STEP 4:
Slide the Affi nity 25E chassis into the countertop so it rests on top of the installed
brackets. Bolt unit to angle brackets using supplied 1/4” x 20 fasteners from underside.
NOTE: Electrical Installation of the service line must be done by a licensed electrician
in accordance with local guidelines once unit has been completely installed.
3 WIRE SERVICE LINE:
black, red and green
208V / 230V, 30AMP,
1-Phase, 50-60Hz
INSERT CHASSIS IN COUNTERTOP
Use supplied 1/4” fasteners to bolt
chassis to angle brackets.