Objectives
part 1
ɉ
The purpose of this document is to provide cabling, installation, and bootup instructions of a
b
b
b
b
b b
b
b
b
b
b
b
b b b
Everynet gateway in an external or tower environment.
b
Terms of use
part 2
ɉ
●
Installer
MUST
strictly follow installation requirements as conditions of product warranty.
b
●
Gateways
MUST
be professionally installed and it is the professional installer’s responsibility
b
to make sure the gateway is properly configured and operated within local country regulatory
b
requirements.
b
●
There are no operator serviceable parts inside this equipment. Service MUST be provided only
b
by a qualified service technician approved by gateway manufacturer.
b
●
Compliance is required with respect to voltage, frequency, and current requirements indicated
b
by manufacturer. Connection to a different power source than those specified may result in
b
improper operation, damage to the equipment or pose a fire hazard.
b
●
PoE power source must have a detachable power cord which has an integral safety ground wire
b
connection to a grounded safety outlet.
b
●
Do not substitute the power cord with one that is not the provided approved type. Never use
b
an adapter to connect a 3-wire cable to a 2-wire outlet as this will damage the equipment.
b
●
The equipment requires the use of the ground wire as a part of the safety certification.
b
Modification or misuse may provide a shock hazard that could result in serious injury or death.
b
●
Contact a qualified electrician or the manufacturer if there are questions about the installation
b
prior to connecting the equipment.
b
●
Protective earthing is provided by approved PoE adapter. Building installation shall provide
b
appropriate short-circuit and GFI protection.
b
●
Protective bonding must be installed in accordance with local national wiring rules and
b
regulations.
b
●
Surge protection and grounding should be used for all outdoor installations
b
●
Equipment cabinet located on the bottom of the tower should be grounded to the grounding
b
system of the tower.
b
●
Shielded Category 5 (or above) cabling with drain wire and earth grounding MUST be used for
b
all terminations of wired connections.
b
●
Ethernet cable MUST be properly grounded through the AC ground of the PoE.
bb
●
Gateway should be grounded to the grounding point on the tower. It is not permitted to ground
b
a gateway directly to the tower structures.
b
●
Lightning arrestor MUST be used to protect for the gateway, lighting protection should be
b
grounded to the grounding point on the tower. It is not allowed to ground a lighting protector
b
directly to the tower structures.
b
●
All coaxial connections should be properly weatherproofed.
b
●
Gateway should be attached to tower pole using metal ties. Use of plastic / nylon ties is
b
prohibited.
b
everynet.com
4
ɉ
Summary of Contents for CloudCell 4G
Page 1: ...b b b CloudCell 4Gb b Installation manualb b b b...
Page 12: ...Cat5 cable testerb b b b everynet com 12...
Page 17: ...b b Mount gateway on the tower pole Tightenb steel ring clampsbb b everynet com 17...
Page 22: ...Insert connector into the CONEC housingb and screw nut b b everynet com 22...
Page 27: ...5 10 Verify gateway is affixed securely on the tower b everynet com 27...