7780M4-ASI / 7780D4-ASI
Quad ASI TDM-Mux/Demux
Revision 1.0
Page 21
Figure 8-2: VistaLINK
®
PRO – Applying JAR Updates
You will be prompted to restart the server to enable the change to take effect. Apply as many JAR
updates as required before restarting the server.
Figure 8-3: Restart Alarm Server Message
"
NOTE: You may confirm that all updates have been successfully applied by
selecting from the menu Tools>View>Show/Hide Product update log.
Shutdown the server by selecting from the menu:
File>Shutdown Server
. Now re-open the server, it is
normal for the start-up to take marginally longer while each individual update is being applied. Once
complete, you may restart the VLPro Clients. As the Client restarts you will experience a short delay
while the update is applied. A prompt will appear confirming that the updates have been applied.