Except for cups, do not place anything on top or above the machine.
The machine is not suitable for installation in an area where a water jet or water
spray might be used.
The machine must not be located on a surface that is sprayed or cleaned with a
water hose, steam jets, steam cleaner, or similar equipment.
The machine must be placed and levelled on a horizontal, water-resistant, heat-
proof, and sturdy base capable of bearing its weight, see
.
For operating, service and safety reasons the machine should be installed with a
clearance of not less than 50 mm at the back and sides from the building or
non-approved equipment. A minimum working space of 650 mm in front the coffee
machine and overhead clearance of at least 250 mm above the bean hoppers
are recommended. A clear height of 1000 mm for E'line, Enigma, Shotmaster and
accessories, 950 mm for Cameo machines and accessories (with high feet) and
900 mm for Légacy, Cameo machines and accessories (with standard feet) from
the top of the installation surface should be ensured. The height of the installation
surface above the floor is at least 800 mm. If the coffee machine connections are
to be run downwards through the counter, please make space for the lines, which
can reduce the usable space below the coffee machine.
The machine is only to be installed in locations where its use and maintenance is
restricted to trained personnel. Please refer to
.
Only connect the machine to the mains in accordance with the information on the
rating plate, see
Rating plate of Légacy machines [21]
.
Adjustment of the frequency is automatic. No action is required.
The power cord must be in accordance with local regulations.
Voltage/current specifications are as listed in the table
overview of Légacy machines [28]
.
To connect the machine to the water mains, use only the original supplied hoses.
Any necessary on-site preparatory work for electricity, water and drainage con-
nections at the customer‘s premises is to be arranged by the machine owner /
manager. The work must be carried out by authorised installation technicians in
compliance with general, country-specific and local regulations. Eversys service or-
ganisations may only connect the machine to existing prepared connection points.
Eversys appointed service organisations are neither authorised, nor responsible for
carrying out any on-site installation work prior to connection.
The requirement prior to initial commissioning checklist is available under the e'Sup-
port center (https://support.eversys.com/hc/en-us).
For Your Safety
Page 13 of 161
Published on 29.06.2022
Legacy User Manual © Eversys S.A.
Summary of Contents for LEGACY L'2c/Classic
Page 1: ...User Manual Published on 29 06 2022 ...
Page 2: ...This page is intentionally left blank ...
Page 34: ...This page is intentionally left blank Published on 29 06 2022 ...
Page 42: ...This page is intentionally left blank Published on 29 06 2022 ...
Page 46: ...This page is intentionally left blank Published on 29 06 2022 ...
Page 66: ...This page is intentionally left blank Published on 29 06 2022 ...
Page 74: ...Settings Menu Legacy User Manual Eversys S A Published on 29 06 2022 Page 74 of 161 ...
Page 77: ...Settings Menu Page 77 of 161 Published on 29 06 2022 Legacy User Manual Eversys S A ...
Page 82: ...This page is intentionally left blank Published on 29 06 2022 ...
Page 128: ...This page is intentionally left blank Published on 29 06 2022 ...
Page 146: ...This page is intentionally left blank Published on 29 06 2022 ...
Page 147: ...11 Appendix Appendix Page 147 of 161 Published on 29 06 2022 Legacy User Manual Eversys S A ...
Page 162: ......
Page 163: ......