Installation (continued) 

 

 

 

 

Completing the installation 

 

 

Connecting the power and verifying 
proper operation 

□ 

(Optional) You can make additional openings in the 
cover (A) utilizing the bosses and sealing hubs (Z – 
AC) provided. Use the drill locator (AD) and hole saw 

guide below for the hub installation. 

□ 

For maximum effectiveness, apply a bead of silicone 
caulk to all cover, flange, and grommet sealing 

surfaces. 

 

Hole Saw Guide 

For Pipe 

Use Hub 

Hole Saw 

1 in. 

E100H 

1-3/4 in. 

1-1/4 in. 

E125H 

2 in. 

1-1/2 in. 

E150H 

2-1/4 in. 

2 in. 

E200H 

2-3/4 in. 

 

 

 

□ 

Make sure that the cord grommet is properly inserted into the 

lid. This assures a water and gas tight seal. 

□ 

Check the pump by filling the basin with water and observe the 

pump’s operation through one complete cycle. 

 

 

 

Summary of Contents for 1002162762

Page 1: ...hance your home Visit us online to see our full line of products available for your home improvement needs Thank you for choosing Everbilt Item 1002162762 Model THD1085 USE AND CARE GUIDE RADON MITIGA...

Page 2: ...ressure and drain all water from the system before servicing any component WARNING Wear safety goggles at all times when working with pumps CAUTION Know the pump and its applications limitations and p...

Page 3: ...ement or garage floor to remove the existing sump or sewage basin Simply remove the old cover and install the Everbilt Radon Mitigation Basin Cover over the opening to create a new sealed system The E...

Page 4: ...r bolts PVC primer PVC cement Safety goggles Hand hacksaw or PVC cutter Silicone caulk and caulk gun MATERIALS REQUIRED NOT INCLUDED PVC pipe PVC fittings PRODUCT DESCRIPTION The cover A and B is pre...

Page 5: ...sembled to lid D 1 K 1 5 in Reducer plate Preassembled to lid D 1 L 1 5 in Discharge O ring Preassembled to lid D 1 M 1 5 in Plastic discharge flange Preassembled to lid D 1 N 1 4 20 x 1 HHC SS Preass...

Page 6: ...osition on the floor Ensure the lid s D discharge opening 1 is aligned with the sump s discharge pipe and the lid bolts Q are aligned with the cover s A threaded nuts B preassembled Mark the concrete...

Page 7: ...e lid D on the cover A Apply a bead of silicone caulk to the underside of the discharge flange assembly K M Install the discharge flange assembly over the pump discharge pipe sealing the bottom plate...

Page 8: ...r the hub installation For maximum effectiveness apply a bead of silicone caulk to all cover flange and grommet sealing surfaces Hole Saw Guide For Pipe Use Hub Hole Saw 1 in E100H 1 3 4 in 1 1 4 in E...

Page 9: ...s problems missing parts Before returning to the store call Everbilt Customer Service 8 a m 7 p m EST Monday Friday and Saturday 9 a m 6 p m EST 1 877 297 6069 HOMEDEPOT COM Retain this manual for fut...

Reviews: