PILOT’S OPERATING HANDBOOK
4-1
EURO
STAR
EV-97
M
M
O
O
D
D
E
E
L
L
2
2
0
0
0
0
0
0
v
v
e
e
r
r
s
s
i
i
o
o
n
n
R
R
Date of Issue:
01/2001
Revision:
Document No.:
EV2000RLPEN
4.1 Introduction
Section 4 provides checklists and amplified procedures for the
conduct of normal operation.
Normal procedures associated with optional systems can be found
in section 9.
4.2
Assembly and disassembly
For assembly and disassembly procedures refer to the Technical
Description, Operating and Maintenance Manual for the Ultra-light
Aeroplane
EV-97 „EUROSTAR“ model 2000 version R.
4.3 Pre-flight
inspection
The pre-flight inspection performance is very important by reason
that incomplete or careless performance could cause aircraft failure.
The following pre-flight inspection procedure is recommended by the
aircraft Manufacturer:
F
O
I
N
F
O
M
A
IO
N
O
N
LY
R
R
T