EUROTRUSS
L I F T E R S
www.eurotruss.com
16
16
FLS-058
Operating Instructions - ENGLISH
4.2 - Remove the legs from their transport supports and insert them in their working po-
sition. Check that they are fully inserted and fixed with their safety lock.
4.3 - Ensure that the lifter is in a vertical position and use the spirit level located on the
base profile to check the bubble is centred. If necessary, adjust its alignment with the
stabilizer plates by turning the handle in the appropriate direction.
4.4 - Change the forks to their horizontal working position and fix them with the fastener
pins, place the load on the forks using a Eurotruss Accessory if necessary, and ensure
that the tower is only used to lift loads vertically. The minimum load is 25 kg.
NEVER RAISE THE TOWER SECTIONS WITHOUT LOAD.
4.5 - Elevation:
4.5.1 - Ensure that all the AET locks are in the
BLOCK posi-
1
2 3 4 5
tion.
4.5.2 - Change the
nº1 AET
lock to the LIFT position.
4.5.3 - Turn the handle clockwise to raise the lifting
carriage of the tower.
4.5.4 - When you have reached the desired height,
fix the
nº1 AET
lock in by turning the handle anti-
clockwise. Change the
nº1 AET
lock to the BLOCK
position.
4.5.5 - Change the
nº2 AET
lock to the LIFT position.
4.5.6 - Turn the handle clockwise to rise the next sec-
tion of the tower.
4.5.7 - When you have reached the desired height, fix
the
nº2 AET
lock in by
turning the handle anti-clockwise.
Check that the
nº2 AET
lock has introduced in to its corresponding hole.
And change the
nº2 AET
lock to the BLOCK position.
4.5.8 - Repeat these steps to raise all the sections of the tower, changing all
the
AET
locks left
orderly
to the LIFT position and turning the handle clockwise.
WARNING:
The tower can be left in any intermediate height if necessary. Just make
sure that the
AET locks are always fixed and introduced. In the unlikely event of cable