&KDSWHU ,167$//$7,21
90( *DWHZD\
Once you have set the desired base address, replace the cover and the six flat head
screws. The L5211 is ready to be installed in any standard VME backplane. Use the
fastening screws on the top rail for reliable operation. Make sure that the target
system has been powered down before installing.
The data cable provided is now connected between the L5211 and the L5206 gateway
repeater module. The L5206 must be permanently located in the proximity dictated
by the length of the cable. A longer cable must not be used.
The L5206 is powered from any conv24 VDC supply, typically the same
supply that some or all of the other LINK hardware is connected to. Loosen the four
cover screws on top of the L5206 and remove the cover. The power terminals are
clearly marked. While the cover is removed, connect the fiber optic data leads to the
L5206 as described in Appendix B. When completed, restore the cover to the unit.
Once all hardware has been connected and the LINK network has been powered up,
apply power to the VME system in which the L5211 is installed. The status LED will
turn on within three seconds. This indicates that the L5211 is communicating
normally with the LINK network. Any other indication suggests there is a problem.
Refer to the LINK Overview Manual HA350678 for troubleshooting information.