00027013.DOC, Version 2.2
14/32
OVERVIEW
(1)
Lens
(2)
Housing
(3)
Fixation screw
(4)
Mounting-bracket
(5)
Attachment eyelet
(6)
Microphone
(7)
Sensitivity control
(8)
Fuseholder
(9)
Power switch
(10)
Power supply
INSTALLATION
Overhead rigging
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.