41907045_V_1_1.DOC
17/33
A safety rope which already hold the strain of a crash or which is defective must not be used again.
Adjust the desired inclination-angle via the mounting-bracket and tighten the fixation screws.
Connect the fixture to the mains with the power-plug.
The occupation of the connection-cables is as follows:
Cable
Pin
International
Brown
Live
L
Blue
Neutral
N
Yellow/Green
Earth
The earth has to be connected!
If the device will be directly connected with the local power supply network, a disconnection switch with a
minimum opening of 3 mm at every pole has to be included in the permanent electrical installation.
DANGER TO LIFE!
Before taking into operation for the first time, the installation has to be approved by an expert!
The power supply of the ventilation-fans comes from the IEC-cable included in the delivery and must be
connected. Plug the IEC-cable into the IEC-socket on the rear panel. Plug the power plug into the power
outlet.
The power supply of the lamps comes from the 6-pin industrial plug. Connect your controller, e. g.
EUROLITE Mini 4-M or EUROLITE LCD-4 MP/S with the 6-pin industrial plug.
The occupation of the 6-pin industrial plug is as follows:
1. Channel 1
4. Channel 4
2. Channel 2
5. Neutral
3. Channel 3
6. Neutral
OPERATION
After you connected the effect to the mains, the ventilation-fans of the CLS-40 start running. You can control
the channels via the connected controller. The lamps light up with the dichroic colours red, yellow, blue and
green.
CLEANING AND MAINTENANCE
The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
3) The electric power supply cables must not show any damages, material fatigue (e.g. porous cables) or
sediments. Further instructions depending on the installation spot and usage have to be adhered by a
skilled installer and any safety problems have to be removed.