ASSEMBLING AND HANGING YOUR CEILING FAN
NOTE:
Before installing ensure that you have all poles disconnection of the electricity supply and that
you refer to qualified electrician to ensure that all wiring is carried out in accordance with
I.E.E. Regulations, current good practice, national and local electrical codes.
A. CLOSE TO CEILING MOUNTING
STEP 1: HANGER BARCKET AND CANOPY INSTALLATION
Secure the hanger bracket to joist with wood screws, rubber and steel washers.
Please make sure it is secured firmly. (See Fig. 1)/page 4.
Release 3 screws from upper housing
Put the canopy pass the electrical supply leads and align the screws holes on the
boss which is on the top of housing. Use the three flush mount set screws
to screw the canopy onto the fan, please make sure it is screwed firmly.
It will cause wobble or risk the fan falling down if the canopy isn't screwed or
tightened correctly. (See Fig 2)/page 4
CAUTION: Be sure that the hanging location can support load of at 70 kilos.
(see Safety Precautions)
3
STEP 2 : BLADE ASSEMBLY
led on to the
The blades now need to be assemb
blade carriers. Note that blades can be
installed with either surface facing down.
Carefully unwrap the blades and carriers. Align
the bracket with the holes in the blades and use
the screws and fibre washers provided to connect
them.
The fibre washer should go on top the blade
between the head of the screw and the surface
of the blade. Ensure the screws are tightened
firmly. Repeat this process for all blades.
Install the blade carrier with blade on to the
motor, using the motor screws to secure it
(provided in screw pack). Please make sure it
is tightened fully. Be careful not to bend the
blades or the carrier brackets during
installation as this may result in an imbalance
and induce wobble.
If installing more than one fan be careful not to
mix the blade sets. Each set is carefully
manufactured to be evenly balanced, mixing
would break up a balanced set and again this
could induce wobble.