SINGLE WIDTH 232 FRAME INSTRUCTION MANUAL 

FOR ERECTION, ALTERING & DISMANTLING

The tower requires a minimum of 2 people for assembly 

Do not attempt to assemble a tower by yourself

6/8 Rung Base Set Up

For Platform Heights:

2.34m, 4.20m, 6.05m, 7.91m 

To achieve platform heights 2.34m, 4.2m, 6.05, or 

7.91m you will need to fit a temporary platform on 

the 1st rung. (See Figure 2)

Fit access platform from 6th rung down on the 8 

rung frame from the original temporary platform. 

Fit handrails from 3T position. Remove temporary 

platform and guardrails then reposition 2 

diagonal braces from 1st to 6th rungs in a

alternate patter and install 1 additional diagonal 

brace from the 6th to 10th rung. (See figure 3)

6/6 Rung Base Set Up

For Platform Heights: 

1.88m, 3.73m, 5.59m, 7.45m, 

When using this frame configuration. 

Start your 

diagonal brace pattern from 2nd to 4th in an 

alternate pattern. Offset trapdoor platform to one 

side allowing a diagonal brace to continue in a 

regular pattern.

Bracing Positions

On rungs with two braces and a platform you will 

need to have one brace sitting on the inside of the 

platform hook and one sitting on the outside of the 

platform hook. You will also need to ofset the 

platform to one side to achieve this. Alternatively 

diagonal braces can be repositioned 1 rung above 

or 1 rung below the platform.

Figure 1

Figure 3

Figure 2

Summary of Contents for 750K

Page 1: ...G LOAD 250KG Trapdoor Platform Diagonal Brace 2M White Green Red 2 5M White Green Yellow 3M White Green Blue Castor Adjustable Leg 232 SINGLE WIDTH TOWER 3T THROUGH THE TRAPDOOR METHOD AUGUST 21 Side...

Page 2: ...ould be replaced and sent for repair or scrap 17 Inspect all tube on frames stabilisers and braces for dents cuts and holes damaged equipment should be isolated tagged and removed from use Check all j...

Page 3: ...r stand on an unprotected platform guardrails must be in place 44 Consider measures to secure the tower when left unattended Stability Moving 45 Ensure the Tower is level and the adjustable legs are e...

Page 4: ...tight and push from at or near the base by manu al effort only never use mechanical means Recheck level and reposition stabilizers before use ALTERNATIVE FRAMES CONFIGURATION For example where 2 x 8 r...

Page 5: ...0m 1 88m 5 13m 1 41 4 66m 7 91m PPE REQUIRED Hard Hat Safety Gloves Safety Boots Shoes Hi Viz Vest Jacket TOOLS REQUIRED Spirit Level...

Page 6: ...from 1st to 6th rungs in a alternate patter and install 1 additional diagonal brace from the 6th to 10th rung See figure 3 6 6 Rung Base Set Up For Platform Heights 1 88m 3 73m 5 59m 7 45m When using...

Page 7: ...Remove your temporary board and guardrail braces Then reposition your diagonal brace to 1st to 3rd and add an additional brace on the al ternative side Finally add an additional diagonal brace from 3r...

Page 8: ...es above first rung Horizontal braces fit on from the inside of the tower facing outwards 5 Fit 1 plain platform on the appropriate rung See base build for desired platform height Level your tower by...

Page 9: ...diagonal braces from 3rd to 1st rung 9 Fit 4 horizontal braces directly above platform to create your collective protection Hooks facing outwards on frame uprights 10 Fit 4 stabilisers at earliest op...

Page 10: ...s illustrated using all components Platforms inserted every 2m complete with handrails Braces run in a continuous pattern on opposite sides 15 For your working platform fit trapdoor on the 6th rung do...