SINGLE WIDTH 232 FRAME INSTRUCTION MANUAL
FOR ERECTION, ALTERING & DISMANTLING
The tower requires a minimum of 2 people for assembly
Do not attempt to assemble a tower by yourself
6/8 Rung Base Set Up
For Platform Heights:
2.34m, 4.20m, 6.05m, 7.91m
To achieve platform heights 2.34m, 4.2m, 6.05, or
7.91m you will need to fit a temporary platform on
the 1st rung. (See Figure 2)
Fit access platform from 6th rung down on the 8
rung frame from the original temporary platform.
Fit handrails from 3T position. Remove temporary
platform and guardrails then reposition 2
diagonal braces from 1st to 6th rungs in a
alternate patter and install 1 additional diagonal
brace from the 6th to 10th rung. (See figure 3)
6/6 Rung Base Set Up
For Platform Heights:
1.88m, 3.73m, 5.59m, 7.45m,
When using this frame configuration.
Start your
diagonal brace pattern from 2nd to 4th in an
alternate pattern. Offset trapdoor platform to one
side allowing a diagonal brace to continue in a
regular pattern.
Bracing Positions
On rungs with two braces and a platform you will
need to have one brace sitting on the inside of the
platform hook and one sitting on the outside of the
platform hook. You will also need to ofset the
platform to one side to achieve this. Alternatively
diagonal braces can be repositioned 1 rung above
or 1 rung below the platform.
Figure 1
Figure 3
Figure 2