TOWER MAX SAFE WORKING LOAD 750K | PLATFORM MAX SAFE WORKING LOAD 250KG

Trapdoor Platform

Diagonal Brace

2M White / Green / Red

2.5M White / Green / Yellow

3M White / Green / Blue

Castor

Adjustable Leg

232 SINGLE WIDTH TOWER

3T - THROUGH THE TRAPDOOR METHOD

AUGUST 21

Side Toe-Board

Multi-Rung Ladder Frame 

6, 8 or 10 Rung

Stabiliser

End Toe-Board

Horizontal Brace

2M Black / Green / Red

2.5M Black / Green / Yellow

3M Black / Green / Blue

AUGUST 21

MANUFACTURED BY EURO TOWERS LTD

Summary of Contents for 750K

Page 1: ...G LOAD 250KG Trapdoor Platform Diagonal Brace 2M White Green Red 2 5M White Green Yellow 3M White Green Blue Castor Adjustable Leg 232 SINGLE WIDTH TOWER 3T THROUGH THE TRAPDOOR METHOD AUGUST 21 Side...

Page 2: ...ould be replaced and sent for repair or scrap 17 Inspect all tube on frames stabilisers and braces for dents cuts and holes damaged equipment should be isolated tagged and removed from use Check all j...

Page 3: ...r stand on an unprotected platform guardrails must be in place 44 Consider measures to secure the tower when left unattended Stability Moving 45 Ensure the Tower is level and the adjustable legs are e...

Page 4: ...tight and push from at or near the base by manu al effort only never use mechanical means Recheck level and reposition stabilizers before use ALTERNATIVE FRAMES CONFIGURATION For example where 2 x 8 r...

Page 5: ...0m 1 88m 5 13m 1 41 4 66m 7 91m PPE REQUIRED Hard Hat Safety Gloves Safety Boots Shoes Hi Viz Vest Jacket TOOLS REQUIRED Spirit Level...

Page 6: ...from 1st to 6th rungs in a alternate patter and install 1 additional diagonal brace from the 6th to 10th rung See figure 3 6 6 Rung Base Set Up For Platform Heights 1 88m 3 73m 5 59m 7 45m When using...

Page 7: ...Remove your temporary board and guardrail braces Then reposition your diagonal brace to 1st to 3rd and add an additional brace on the al ternative side Finally add an additional diagonal brace from 3r...

Page 8: ...es above first rung Horizontal braces fit on from the inside of the tower facing outwards 5 Fit 1 plain platform on the appropriate rung See base build for desired platform height Level your tower by...

Page 9: ...diagonal braces from 3rd to 1st rung 9 Fit 4 horizontal braces directly above platform to create your collective protection Hooks facing outwards on frame uprights 10 Fit 4 stabilisers at earliest op...

Page 10: ...s illustrated using all components Platforms inserted every 2m complete with handrails Braces run in a continuous pattern on opposite sides 15 For your working platform fit trapdoor on the 6th rung do...

Page 11: ...unguarded platform Do not lift the tower with mechanical equipment Do not use the tower for access and egress to other structures Do not suspend the tower Do not lift heavy ob jects from the tower Do...

Page 12: ......