Shatal Engineering India Pvt. Ltd.
5/153/07 Poolakkadu Thottam Arasur,
Coimbatore – 641407,
Tamil Nadu, INDIA
Winch disassembly:
Disassemble the winch, in opposite order of the assembly order.
Maintanance and guidelines:
All electricity maintanance must be executed by a certified electrician.
The wire cables must be checked for abrasion weekly in accordance with local and
federal safety standards and regulation specifications to prevent cable tear and
folding.
The wire cable must be replaced in case of abbraision.
The winch must be protected from rain, specifically the breaks must remain dry.
The axial housing bearings must be greased bi-weekly.
Maintain assembly cleanliness, specifically wire cable cleanliness.
After assembly, a certified safety inspector must approve work conditions before winch
use.
Unapproved operation is forbiden
Contact Shatal for all problems and questions involving the winch.
Shatal and all Shatal affiliations are not responsible for all damages caused by improper
use not in accordance with this manual.