background image

Images are for illustrative purposes.

We reserve the right to make changes.

5

®

RDM-31-0222

NORD

canopy

  

 

|

   

OZ 3.0 Installation Guide

3.  Prepare the Ozone Modules

3.1  Set the device addresses

Each OZ module must be set to a unique device address

A flashlight and a long, narrow 2mm flat-head screwdriver will be 

needed for this procedure. The unit will not need to be opened as the 

necessary rotary switches can be accessed through the air intake at 

the bottom of the chassis as shown in the picture.

NOTE! Before installing any Ozone Module, please ensure that 

its air intake adjustment plate, if installed, is adjusted for full 

airflow through the perforated holes and the fixing screw is 

tightened. 

Set the device address for each Ozone Module by turning the 

rotary address switches located on the upper left corner of the 

air intake grid. The address is set using the switches marked 

“1x” and “10x”. The “1x” switch is positioned nearest the corner 

of the circuit board.

Example:

Ozone Module one (Adress 1):  
Switch 1x = 1
Switch 10x = 0

Ozone Module thirteen (Adress 13):  
Switch 1x = 3
Switch 10x = 1

Addresses should be set in ascending order begin with the Ozone Module closest to the Control Panel and 

increasing by one for each sequential module. The first connected Ozone Module should have the address 1.

Mark the installation positions of each Ozone Module

The location of each Ozone Module shall be marked by placing an identification label on the upper front panel 

of the canopy. The label should match the device address of 

the module installed beneath it. You will find a sheet of labels 

in the Control Panel package. 

1x

6

10x

8

4

2

0

Do not attach the sticker to the perforated 

area of the canopy

.

NOTE!

 Installation may only be carried out by ETS NORD trained and authorized persons in 

accordance with local, regional, national standards and regulations.

Summary of Contents for NORDcanopy OZ 3.0

Page 1: ...NORDcanopy OZ 3 0 Ozone Cleaning System Installation Guide...

Page 2: ...odules 5 3 1 Set the device addresses 5 4 Installation 6 4 1 General information 6 4 2 Connect the pressure measurement hoses 7 4 3 Mount the Control Panel 8 5 Electrical Installation 9 5 1 Connect th...

Page 3: ...t generates ozone O3 Ozone significantly reduces odor grease mold and bacteria ETS NORD AS disclaims any liability in the case that the product is not used in accordance with the manufacturer s instru...

Page 4: ...f Ozone Modules is dependent on the design of the kitchen and the canopy as well as the equipment used for cooking This is decided when planning the kitchen 2 System overview The Ozone Modules produce...

Page 5: ...r intake grid The address is set using the switches marked 1x and 10x The 1x switch is positioned nearest the corner of the circuit board Example Ozone Module one Adress 1 Switch 1x 1 Switch 10x 0 Ozo...

Page 6: ...facturer s drawings The ozone duct must be made of acid resistant stainless steel AISI 316 Before starting the Ozone Module check visually that all ozone duct connections are airtight Always leave a m...

Page 7: ...dule into place securely attach one end of the hose to the hose located in the Ozone Module 100mm flange Raise the module into place gently pulling the hose from its other end to ensure it does not be...

Page 8: ...it near any sources of moisture or heat The housing must be disassembled into three parts Remove the two fixing screws on the sides of the case Before mounting the backplate apply an even strip of wa...

Page 9: ...alarm panel may be connected a single 10A C type slow circuit breaker NOTE Electrical installation must be performed by an authorized electrician and follow local regional and national standards and...

Page 10: ...sed on each generator as would normally be done for external appliances Control Panel power cables may be fed through either the rear wall or the cable bushings in the bottom of the case Connect the 2...

Page 11: ...ntrol Panels in larger facilities Cable bushings come preattached inside the supply chambers 3x0 25 mm2 or another shielded data cable with at least 3 conductors Data terminal A B and C GND are connec...

Page 12: ...and mark the other ends of the wires within the junction box with their corresponding terminal assignments Rout the other end to a junction box that is situated near or on top to the canopy Control Pa...

Page 13: ...LAN cable straight to the port on the board as seen below LAN cable must be connected to a network switch or to the closest LAN socket Reassemble the housing in reverse order with the smaller LED dis...

Page 14: ...the device has been performed by an authorized partner of ETS NORD AS the equipment is serviced every 12 months after commissioning specified components eg ozone generating equipment have been replace...

Page 15: ...etsnord ee ETS NORD Finland Address Pakkasraitti 4 04360 Tuusula Finland Phone 358 401 842 842 info etsnord fi www etsnord fi ETS NORD Sweden Address J rsj gatan 7 69235 Kumla Sweden Phone 46 70 780...