
Doc. Ref.: ETION-MED-MDF-01-06-08 (Rev 02)
I
5
Connecting the device to UPS
1.
Ensure the therapy device is turned off.
2.
Plug in the AC adaptor into the Cube 25 NIV. Clamp the cord securely to the Cube 25 NIV
enclosure.
3.
Plug the AC adaptor into the one of the clearly marked battery backed-up power sockets on
the UPS unit. Ensure that the UPS remains a minimum of 0.5 meters from the Cube 25 NIV
and patient.
NOTE
The UPS is not intended to be used to power your Cube 25, but for backup power purposes in the event of
an unexpected loss of power. The UPS must be placed at least 0.5 m away from the Cube 25 and patient.
Be certain to plug the UPS power cord directly into a wall outlet and not into a surge protector. The UPS
outlets are powered whenever the UPS is switched ON. During a power outage, the UPS outlets will be
powered for a limited time depending on the specifications of the UPS. The UPS may take up to 6 hours to
complete a full charge.
Recommended minimum specifications for an Uninterruptible Power Supply
•
Uninterruptible Power Supply: 110 to 240 v
•
Operation time: > 30min