background image

Model # 50242162

Use and Care GUide

Linear HiGH BaY Led

 nOTe

Keep your receipt and these instructions for proof of 

purchase.

 WarninG

Shut off the power at the circuit breaker or fuse panel 

before removing the old fixture, ballast, or fluorescent tubes.

If you are unfamiliar with electrical installations, we recommend you 

contact a qualified electrician to do the installation.

INSTALLATION

nOTiCe

Select a suitable location that can support the weight of 

the fixture. It is the installers responsibility to determine the method of 

mounting and mounting hardware required for the desired mounting 

location before beginning installation.

 

Shut off power at the electrical panel before beginning the 

installation. 

 

Remove existing fixture and set aside to recycle in accordance 

with local requirements.

3a

PAckAge cONTeNTS

Part Description 

Quantity 

Fixture

1

B

Metal Chain

2

C

S-Hook

2

D

Wire Connector

3

E

V Clip

2

F

Mounting Bracket

1

G

Mounting Plate Cover

2

H

Mini Conduit Adapter for 

Downrod Mounting

1

I

1/2" Downrod Mount

1

J

Long Screw

2

K

Short Screw

10

Mark two spots on the ceiling 24.6 in. apart and install 

hooks (not included) into the ceiling if installing into 

wood or use the required hardware for the desired 

mounting location.

6a

Connect the V Clips to each end of the fixture 

housing.

Connect the S-Hooks to the V Clips and then 

connect the metal chains to each S-Hook. 

Use pliers to pinch the S-Hooks closed.

Part # HBL-2FT-18000LM-8-50K-MV-LVd-Os

Certification # 50242162

SuSPeNSION MOuNTINg INSTALLATION

Screw

7a

8a

Attach the metal chains to the 

hooks in the ceiling. The fixture 

must hang 3ft. from the ceiling.

9a

Make the electrical connections:

•  Feed wires from the fixture through the conduit 

based on local electrical code.

•  Black wire to black wire.

•  White wire to white wire.

•  Ground wire from fixture to ground from driver 

box cover plate to the ground wire from the 

electrical box.

•  Use wire connectors to cover the wire 

connections and wrap with electrical tape.

Hook

SurfAce MOuNTINg INSTALLATION

3b

Feed wires from the electrical box through the mounting 

bracket. Then use 2 long screws to attach the mounting 

bracket to the mounting surface. Use 4 short screws to attach 

the 2 mounting plate covers to the mounting bracket.

5b

Attach the fixture to the mounting bracket by aligning the 

slots on the fixture to the mounting bracket. Tilt the fixture 

to insert it into the mounting bracket, and then push the 

other side of the fixture into the mounting bracket.  Use 4 

short screws to secure the fixture to the mounting bracket.

1
2

B

D

A

1/2 in. knockout

3/4 in. knockout

Green ground

24.6 in.

4a

Remove the driver box cover plate and punch out the 

knock out hole.

Feed the 1/2 in. or 3/4 in. conduit (based on local 

electrical code) through the respective knock out hole.

5a

Driver Box Cover Plate

E

B

B

D

10a

Tuck wires inside the driver box and 

reattach the driver box cover plate.

Restore power at the electrical panel.

4b

Remove the driver box cover 

plate from the fixture.

G

F

Driver Box 

Cover Plate

F

A

Hook

C

Summary of Contents for 50242162

Page 1: ...sed Part HBL 2FT 18000LM 8 50K MV LVD OS Certification 50242162 Suspension Mounting Installation Screw 7a 8a Attach the metal chains to the hooks in the ceiling The fixture must hang 3ft from the ceiling 9a Make the electrical connections Feed wires from the fixture through the conduit based on local electrical code Black wire to black wire White wire to white wire Ground wire from fixture to grou...

Page 2: ...y period 5 min 10 min 30 min Stand by dimming level 30 5min 10min 30min Hold time Stand by time 5min 10min 30min NOTE When the hold time is adjusted to the detects motion function is turned off The light will not be dimmed When the hold time is set to 5 min 10 min 30 min the light will be dimmed to the standby dimming level of 30 automatically after 10 seconds and go back to 100 if movement is det...

Page 3: ...aque crochet en S Utilisez des pinces pour fermer les crochets en S N de pièce HBL 2FT 18000LM 8 50K MV LVD OS N de certification 50242162 Suspension Mounting Installation Vis 7a 8a Suspendez les chaînes de métal aux crochets dans le plafond La lampe doit être suspendue à une distance de 91 cm du plafond 9a Effectuez les connexions électriques Acheminez les fils du luminaire à travers la conduite ...

Page 4: ...du couvercle de la boîte du transfo et au fil de terre de la boîte électrique Couvrez les connexions avec des serre fils et un ruban isolant MONTAGE EN SURFACE Suite 7b Vis Boîtier de lampe A D 8b Insérez les fils dans la boîte du transformateur et remettez le couvercle du transformateur Rétablissez le courant au panneau électrique Vis 7c Réinsérez les fils dans le luminaire et réattachez le boîti...

Page 5: ...S Parte HBL 2FT 18000LM 8 50K MV LVD OS Certificación 50242162 INSTALACIÓN SUSPENDIDA Tornillo 7a 8a Fije las cadenas de metal a los ganchos en el techo La lámpara debe colgar 3 pies desde el techo 9a Hacer las conexiones eléctricas Pase los cables de la lámpara a través del conducto según el código eléctrico local Cable negro a cable negro Cable blanco a cable blanco Conecte a tierra el cable des...

Page 6: ...es para cubrir las conexiones de cables y envuélvalos con cinta aislante INSTALACIÓN EN SUPERFICIE Continuación 7b Tornillo A D 8b Meta los cables dentro de la caja del activador y vuelva a colocar la tapa de la caja del activador Restablece la energía en el panel eléctrico Tornillo 7c Meta los cables dentro de la caja del activador y vuelva a colocar la tapa de la caja del activador Restablece la...

Reviews: