Model # 50242162
Use and Care GUide
Linear HiGH BaY Led
nOTe
:
Keep your receipt and these instructions for proof of
purchase.
WarninG
:
Shut off the power at the circuit breaker or fuse panel
before removing the old fixture, ballast, or fluorescent tubes.
If you are unfamiliar with electrical installations, we recommend you
contact a qualified electrician to do the installation.
INSTALLATION
nOTiCe
:
Select a suitable location that can support the weight of
the fixture. It is the installers responsibility to determine the method of
mounting and mounting hardware required for the desired mounting
location before beginning installation.
Shut off power at the electrical panel before beginning the
installation.
Remove existing fixture and set aside to recycle in accordance
with local requirements.
3a
PAckAge cONTeNTS
Part Description
Quantity
A
Fixture
1
B
Metal Chain
2
C
S-Hook
2
D
Wire Connector
3
E
V Clip
2
F
Mounting Bracket
1
G
Mounting Plate Cover
2
H
Mini Conduit Adapter for
Downrod Mounting
1
I
1/2" Downrod Mount
1
J
Long Screw
2
K
Short Screw
10
Mark two spots on the ceiling 24.6 in. apart and install
hooks (not included) into the ceiling if installing into
wood or use the required hardware for the desired
mounting location.
6a
Connect the V Clips to each end of the fixture
housing.
Connect the S-Hooks to the V Clips and then
connect the metal chains to each S-Hook.
Use pliers to pinch the S-Hooks closed.
Part # HBL-2FT-18000LM-8-50K-MV-LVd-Os
Certification # 50242162
SuSPeNSION MOuNTINg INSTALLATION
Screw
7a
8a
Attach the metal chains to the
hooks in the ceiling. The fixture
must hang 3ft. from the ceiling.
9a
Make the electrical connections:
• Feed wires from the fixture through the conduit
based on local electrical code.
• Black wire to black wire.
• White wire to white wire.
• Ground wire from fixture to ground from driver
box cover plate to the ground wire from the
electrical box.
• Use wire connectors to cover the wire
connections and wrap with electrical tape.
Hook
SurfAce MOuNTINg INSTALLATION
3b
Feed wires from the electrical box through the mounting
bracket. Then use 2 long screws to attach the mounting
bracket to the mounting surface. Use 4 short screws to attach
the 2 mounting plate covers to the mounting bracket.
5b
Attach the fixture to the mounting bracket by aligning the
slots on the fixture to the mounting bracket. Tilt the fixture
to insert it into the mounting bracket, and then push the
other side of the fixture into the mounting bracket. Use 4
short screws to secure the fixture to the mounting bracket.
A
1
2
C
B
D
E
F
G
H
I
J
K
A
1/2 in. knockout
3/4 in. knockout
Green ground
24.6 in.
4a
Remove the driver box cover plate and punch out the
knock out hole.
Feed the 1/2 in. or 3/4 in. conduit (based on local
electrical code) through the respective knock out hole.
5a
Driver Box Cover Plate
E
B
B
D
10a
Tuck wires inside the driver box and
reattach the driver box cover plate.
Restore power at the electrical panel.
4b
Remove the driver box cover
plate from the fixture.
G
F
Driver Box
Cover Plate
F
A
Hook
C