
-8-
3. Data Access/ Exit
In test mode, press
PEAK
and
POWER
key to access data inquiry form
group
“
R
:
01
”
, and display
“
MR
”
symbol. Press
PEAK
or
POWER
key to
increase or decrease the page number, it will automatically return back to
group 01 when access the last group.
Press
HOLD
key to exit date inquiry, back to test mode.
4. Data Upload
Connecting the meter and computer with USB-RS232 communication
line attached in package. Start up the meter, run software, choose history
access, then read, save, report, print history data, etc. The more data storage,
take the longer time to read it. Historical data can be saved in Txt text or Excel
format.
5. Delete Data
In the date inquiry mode, press
PEAK
and
POWER
key to delete all the
stored data, and return back to test mode. At the same time,
“
dEL
”
symbol
display.
6. General Measurement
During the measurement, the LCD real-time display the value of
measured current and leakage current, the value displayed on LCD change
with different current and leakage current. No measured value reserved when
take the meter away from measured wires, LCD display zero.
High voltage, very dangerous
!
Only qualified personnel
after training could conduct operation on it. The operator
should obey safety regulations; Otherwise there will be the
danger of electric shock resulting in personal injury or
casualty.
Dangerous! Can not be used to test voltage higher than
600V. Otherwise there will be the danger of electric shock
resulting in personal injury or casualty.
Summary of Contents for 7100
Page 1: ......