ETC

Connect Ethernet

Note:

All Ethernet terminations must follow IEEE 802.3 and be terminated to the T568B

standard.

1. Terminate the network wiring in the provided RJ45 punchdown block using a standard

110 punchdown tool (not provided). The connector is labeled for Cat5e wire termination
color code. Do not pre-strip the conductors, the punchdown connector provides insulation
displacement.

2. Snap the connector into the bracket.

Connect Auxiliary Power and ESD Ground

Terminate the incoming wiring to the provided Auxiliary Power and ESD Ground wire pigtails.

1. Connect the ESD ground wire pigtail.

a. Strip 11 mm (7/16 in) of insulation from the ends of

the station ground wire pigtail, provided in the
termination kit, and the incoming ground wire.

b. Use one WAGO

®

connector, provided in the

termination kit, to connect the station ESD ground
pigtail and the incoming ground. For stations using
grounded metal conduit, connect the ground pigtail
to the metal back box ground location.

c. Install the ESD ground wire pigtail to the spade terminal on the termination board.

2. Terminate and connect 24 VDC Auxiliary Power. Use copper conductors only, typically a

1.5 mm

2

(16 AWG) black and red wire pair.

a. Strip 11 mm (7/16 in) from the ends of each conductor (Aux Power pigtail provided and

the installed power wires).

b. Use the provided WAGO connectors to connect the power pigtail and the installed power

wires. One WAGO should be used for the red pair (power +) and one for the black wire
pair (power -). Open the terminal levers on the WAGO connector and insert the installed
wire and the lead from the pigtail to into the terminals, and then close the levers.

c. Install the two-position connector from the pigtail to the mating receptacle on the

termination board.

Summary of Contents for Paradigm P-TS7-E

Page 1: ...inated by a qualified installer and should follow standard wiring installation practices Leave approximately 25 4 cm 10 in of wiring in the back box for connection and to allow slack for future service needs For more information about terminating Cat5 cable refer to the ETC Ethernet Cat5 Termination Kit Setup Guide Installation Note Installation must follow all national and local codes for electri...

Page 2: ...g screws through the collar and tighten into the back box mounting holes Install the Termination Board The installation kit provided includes a termination board and all termination supplies required for Ethernet with Auxiliary Power or Ethernet with PoE and ESD ground terminations RJ45 Ethernet or Ethernet with PoE Touchscreen Ground 24 VDC Auxiliary Power ESD Ground Note Connect to the touchscre...

Page 3: ...ground wire b Use one WAGO connector provided in the termination kit to connect the station ESD ground pigtail and the incoming ground For stations using grounded metal conduit connect the ground pigtail to the metal back box ground location c Install the ESD ground wire pigtail to the spade terminal on the termination board 2 Terminate and connect 24 VDC Auxiliary Power Use copper conductors only...

Page 4: ...on each side of the collar 4 To move the touchscreen from the service position to the operation position lift to unhook the pins and rotate the bottom inward until the touchscreen face is vertical 5 Apply firm pressure simultaneously to the center of the left and right edges of the touchscreen pushing the unit inward until it audibly snaps onto the collar When properly installed the touchscreen sh...