Echoflex Installation Guide

Power Load Controller

Power Load Controller

 Page 6 of 8

Echoflex

Clear Button

The 

[Clear]

 button resets the controller either to its pre-commissioned state 

or to its factory default state.

To reset to pre-commissioned state:

1. Press the 

[Clear]

 button until the Power and Learn LEDs start blinking.

2. Release the 

[Clear]

 button. The Power LED displays a color blink code 

to indicate the type and number of devices linked to each channel at 
pre-commissioning.

To reset to factory default state:

1. Press and hold the 

[Clear]

 button until the Power and Learn LEDs start 

blinking. Continue to hold for 15 seconds until the LEDs turn solid. 

2. Release the 

[Clear]

 button. The Power LED displays solid red to indicate 

factory default state. All links are removed.

Test the Controller

Echoflex provides the controller in either a pre-commissioned state or a 
factory default state.

• Pre-commissioned devices are linked, configured, and labelled 

according to customer specifications. When powered up, the Power 
LED repeats a blink code to indicate the type and number of devices 
currently linked to the controller. See 

Blink Codes and Operations

 

on 

page 7

. To test the relay(s), press the 

[Learn]

 button or use a 

linked switch.

• In factory default state, when powered up, the Power LED displays 

solid red to indicate the controller has no linked devices. To test the 
relay(s), press the 

[Learn]

 button or link a switch. See relevant switch 

documentation. 

A maximum of 20 switches or sensors can be linked to one controller.

Summary of Contents for echoflex ELEDR-RH

Page 1: ...nd network commands The ELEDR can also provide process control for circuit or fan control applications eliminating long wire runs This document covers installation of ELEDR H Power Load Controller models The Echoflex Power Load Controller ELEDR Configuration Guide is available for download at echoflexsolutions com The package contents includes the controller and the installation guide Prepare for ...

Page 2: ...ck This device utilizes high voltage and should only be installed by a qualified installer or electrician Follow all local codes for installation Before terminating the AC power wiring verify that the main breaker is in the off position and follow the proper lockout tag out procedures per NFPA Standard 70E AVERTISSEMENT Risque de décharge électrique Cette appareil utilise une haute tension et ne d...

Page 3: ...efore installing the controller 1 Locate the circuit breaker panel and terminate power to the circuit 2 Remove the cover plate and other hardware from the junction box to access the wiring 3 Mount the controller 4 Refer to the wiring diagram to connect the controller to line power neutral and load wires Use wire nuts on all connections and individually cap any bare wires except the orange antenna ...

Page 4: ...ast or LED Driver ELEDRH 20 A 240 277 VAC Electronic Ballast or LED Driver ELEDH 16 A 347 VAC Electronic Ballast or LED driver Max Switching Load ELEDR 20 A 120 277 VAC Electronic Ballast or LED Driver ELEDRH 20 A 240 277 VAC Electronic Ballast or LED Driver ELEDRH 16 A 347 VAC Electronic Ballast or LED Driver Max Impulse Voltage 4000 V Internal Relay Type 1 C Motor load ra ng 1 5 HP 120 VAC and 3...

Page 5: ... providing information via blink codes or is in an operational mode See Blink Codes and Operations on page 7 Learn Button The Learn button initiates Link mode for linking switches or sensors to the controller See the relevant switch or sensor documentation for information on linking Link mode times out after 30 seconds of inactivity Repeating the linking process for a device that is already linked...

Page 6: ... 2 Release the Clear button The Power LED displays solid red to indicate factory default state All links are removed Test the Controller Echoflex provides the controller in either a pre commissioned state or a factory default state Pre commissioned devices are linked configured and labelled according to customer specifications When powered up the Power LED repeats a blink code to indicate the type...

Page 7: ...Operations Description Power LED Learn LED Factory default On solid Off Switch es 1 long blink followed by short blinks counting switches Off Occupancy sensor s 2 long blinks followed by short blinks counting sensors Off Photo sensor s 3 long blinks followed by 1 short blink counting sensor Off Central command 4 long blinks followed by short blinks counting devices Off Demand response 5 long blink...

Page 8: ...x Power Load Controller datasheet at echoflexsolutions com FCC Part 15 231 Contains FCC ID SZV STM300U This device complies with part 15 of the FCC rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation IC RSS 210 ...