11
Molift Air 200/350 | BM16199 Rev I | www.etac.com
Transfer - disconnected transition coupling
Do not perform any transfer of user before you have checked the
following:
Both gates
①
are visible (transition coupling unit seen from
below).
①
To connect
Before connecting the transition coupling units, ensure trolley is
min. 0.5 m away from transition coupling unit.
Push traverse rail in the desired direction.
Click
Push the traverse rail towards the stationary rail, so the transition
coupling units connect, and you hear a sound.
Transfer - connected transition coupling
Do not perform any transfer of user before you have checked the
transition coupling units are completly locked together. Pushing
the rails apart by hand must be impossible.
The user can now be transferred from one rail to another.
②
Locking bolt
②
must
not
be visible when coupling is disconnec-
ted.
Summary of Contents for Molift Air 200
Page 1: ...Molift Air 200 350 User manual BM16199 Rev I 2022 05 05...
Page 2: ...2 Molift Air 200 350 BM16199 Rev I www etac com...
Page 126: ...123 Molift Air 200 350 BM16199 Rev I www etac com Notes Notes...
Page 127: ...124 Molift Air 200 350 BM16199 Rev I www etac com Notes Notes...
Page 128: ...Etac A S Parallelvej 3 DK 8751 Gedved www etac com...